
U S E R ’ S M A N U A L
2
hapter
2
C
Installation
Unpacking and Set-Up
T
he server is delivered in packaging designed to protect it from the stress
of shipping. It is recommended that this packaging be saved and reused
should the server need to be transported to another location.
2.1 Unpacking the System
Upon opening the shipping carton, the user encounters two additional boxes - the
server accessories kit and the chassis slide rails. Remove the accessories kit and
inspect its contents. The accessories kit may contain the following items:
•
Drive Carriers (Quantity = 2)
•
AC Power Cord (Quantity = 1)
•
Recovery & Drivers CD (Quantity = 1)
The server is encased in a multi-piece foam carrier. To remove the server, first
remove the upper foam inserts and then lift the server out of its foam. Once free of
the shipping carton, place the server on a sturdy work surface. The server may be
fitted with the following equipment:
•
AMD Opteron Processors (Quantity = 2)
•
256MB Registered ECC DDR SDRAM DIMMs, PC2100, CL 2.5 (Quantity = 4)
•
Power Supply (Quantity = 1)
•
DVD-ROM Drive, IDE (Quantity = 1)
2-1
Summary of Contents for A2210
Page 1: ...A2210 User s Manual ...
Page 2: ......
Page 3: ...A 2 2 1 0 User sManual SS030616 06 Celestica 9 Northeastern Boulevard Salem NH 03079 ...
Page 8: ...vi ...
Page 28: ...U S E R S M A N U A L 4 4 ...
Page 41: ...U S E R S M A N U A L Figure 18 Moving the SCSI Cable Figure 19 Moving the PCI Cage 6 7 ...
Page 48: ...U S E R S M A N U A L 6 14 ...
Page 54: ...U S E R S M A N U A L 7 6 ...
Page 55: ...U S E R S M A N U A L 7 7 ...
Page 56: ...U S E R S M A N U A L 7 8 ...
Page 57: ...U S E R S M A N U A L 7 9 ...
Page 58: ...U S E R S M A N U A L 7 10 ...
Page 76: ......