
ISSUE 4.0
CEECO
Communication Equipment & Engineering Company
PROPRIETARY
12
7.0 INSTALLATION NOTES AND ASSEMBLY INSTRUCTIONS
7.1
Using a 301-064 security tool (sold separately) to remove the four locking
screws.
7.2
The security tool is for a standard 5/32" button head screw generally used
on the framework of the phone booths.
7.3
Separate the cover assembly from the Housing.
7.4
Run the inside station wire through the Housing and terminate on to the
RJ11C modular jack on the housing, as depicted on the following page.
This CEECO-provided modular jack must be used, as it contains required
over-voltage protection.
7.5
The use of a gas tube or carbon station protector is recommended. The
station ground should not exceed 50 ohms.
7.6
Plug the modular line cord from the PC board into the RJ11C terminal
block.
7.7
Dress the line cord away from the locking screws and seat the faceplate
into the enclosure.
7.8
Secure the cover assembly by tightening the security screw.
*****WARNING*****
A.
Never install telephone wiring during a lightning storm.
B.
Never install telephone jacks in wet locations unless the jack is
specifically designed for wet locations.
C.
Never touch uninsultated telephone wires or terminals unless
the telephone line has been disconnected at the network
interface.
D.
Use caution when installing or modifying telephone lines.