3/8” Flat
Washer
3/8” Lock Nut
Plastic
Formed
Washer
270
Heavy L-Bracket
3/8” Flat
Washer
3/8” Flat
Washer
Cedar Summit Plaque
x 4
G18
G17
G20
Plastic
Formed
Washer
3/8” Lock Nut
3/8” Flat
Washer
T-Nut
270
G17
Heavy G-Bracket
S18
4 x
#6 x 1” Wood Screw
1 x
3/8 x 4” Hex Bolt
(3/8” flat washer x 2 & 3/8” lock nut)
Step 24: Swing Post Assembly
Part 2
D:
Attach Cedar Summit plaque to centre of (270) Engineered SW
Beam (over top of t-nut) using 4 (S18) #6 x 1” Wood Screws. (fig.
24.6)
E:
Place (270) Engineered SW Beam on the Heavy T-Bracket and
attach to fort with 1 (G17) 3/8 x 6” Hex Bolt (with 2 flat washers,
plastic formed washer and lock nut) and 1 (G18) 3/8 x 9” Hex Bolt
(with 2 flat washers, plastic formed washer and lock nut) as shown
in fig. 24.7 and 24.8.
F:
Place (270) Engineered SW Beam (end without Wafer Bolt from
Step 24) in between Heavy L-Brackets assembled in Step A making
sure holes are lined up then attach Swing Post Assembly to Swing
Beam Assembly using 1 (G20) 3/8 x 4” Hex Bolt (with 2 flat washers
and lock nut) through Heavy L-Bracket. (fig. 24.9)
G:
Attach (270) Engineered SW Beam to Heavy G-Bracket with 1
(G17) 3/8 x 6” Hex Bolt (with 2 flat washers, plastic formed washer
and lock nut). (fig. 24.9)
2 x
3/8 x 6” Hex Bolt
(3/8” flat washer x 2, plastic formed washer & 3/8” lock nut)
1 x
3/8 x 9” Hex Bolt
(3/8” flat washer x 2, plastic formed washer & 3/8” lock nut)
G17
Hardware
G18
Other Parts
1 x Cedar Summit plaque
G20
S18
Fig. 24.6
Fig. 24.7
Fig. 24.8
Fig. 24.9
Heavy
T-Bracket
Front View
Cedar Summit
Plaque in front
of beam
Back
89