![Cedar Summit STORYBROOKE PLAYHOUSE P280070 Installation And Operating Instructions Manual Download Page 36](http://html1.mh-extra.com/html/cedar-summit/storybrooke-playhouse-p280070/storybrooke-playhouse-p280070_installation-and-operating-instructions-manual_2578713036.webp)
36
1 x
Shutter Top Bottom FSC 1-1/2 x 1-1/2 x 18-1/4”
1 x
Shutter Stop FSC 5/8 x 1-1/2 x 13-1/4”
Step 10: Shutter Assembly
Part 2
Fig. 10.4
Wood Parts
D:
Below the opening in the Side Wall place 1 (101) Shutter Top Bottom flush to the bottom of the opening and
attach from the inside with 2 (S15) #8 x 1-3/4” Wood Screws. Notice the holes are towards the outside of the
board. (fig. 10.3, 10.4 and 10.5)
E:
Centred in the opening and flush to the inside edge of the Shutter Panel attach (102) Shutter Stop to Shutter
Panel with 4 (TS) #6 x 30 mm Trim Screws. (fig. 10.4 and 10.5)
F:
Centred on and flush to the outside edge of (102) Shutter Stop attach Magnetic Catch with 2 (S18) #6 x 1”
Wood Screws. (fig. 10.4 and 10.5)
102
Notice hole
orientation
1 x Magnetic Catch
Other Parts
Hardware
101
Fig. 10.3
101
Magnetic
Catch
Flush
2 x
#8 x 1-3/4” Wood Screw
2 x
#6 x 1” Wood Screw
4 x
#6 x 30 mm Trim Screw
TS
S15
S18
102
Outside View
Side Wall
Inside View
Fig. 10.5
Side Wall
S15
TS
TS
S18
Notice hole
orientation
102
Flush
Flush
Magnetic
Catch
Flush