![Cedar Summit STORYBROOKE PLAYHOUSE P280070 Installation And Operating Instructions Manual Download Page 14](http://html1.mh-extra.com/html/cedar-summit/storybrooke-playhouse-p280070/storybrooke-playhouse-p280070_installation-and-operating-instructions-manual_2578713014.webp)
14
Step 2: Roof Assembly
Part 1
A:
Flush to the bottom of (021) Roof Panel attach 1 (023) Roof Panel Side using 4 (S3) #8 x 2-1/2” Wood Screws.
Make sure (023) Roof Panel Side is tucked in under the siding overhang. This will help prevent leaks when it
rains. (fig. 2.1 and 2.2)
Repeat Step A for (022) Roof Panel Wide.
Wood Parts
Hardware
8 x
#8 x 2-1/2” Wood Screw
S3
1 x
Roof Panel FSC 1-1/4 x 35-7/8 x 44-3/4”
1 x
Roof Panel Wide FSC 1-1/4 x 36-1/8 x 44-3/4”
2 x
Roof Panel Side FSC 1-11/16 x 6-3/4 x 44-3/4”
021
022
023
Fig. 2.1
Fig. 2.2
021
022
023
Tuck under siding
overhang
Flush
and
021
022
and
S3
023