36
Step 12: Square and Secure Assembly
Fig. 12.2
0369
0369
A:
Make sure assembly is square then tighten all bolts from Steps 10 and 11. (fig. 12.1)
Note: Pre-drill all holes using a 3/16” drill bit before installing the lag screws.
B:
Fasten (2188) SW End to (2180) Posts, in the bottom holes, using 2 (LS3) 1/4 x 3” Lag Screws (with flat
washer). (fig. 12.2)
C:
Attach the top end of (0369) Lower Diagonal to each (2180) Post with 1 (LS2) 1/4 x 2-1/2” Lag Screw (with
flat washer) per diagonal. (fig. 12.2 and 12.3)
0369
1/4” flat
washer
Hardware
2 x
1/4 x 2-1/2” Lag Screw (1/4” flat washer)
2 x
1/4 x 3” Lag Screw (1/4” flat washer)
LS2
Fig. 12.1
Fig. 12.3
LS3
Swing Wall
Swing Wall
Front Wall
Back Wall
2188
LS2
LS2
LS3
1/4” flat
washer
1/4” flat
washer
LS2
2180