www.usaprocom.com
200125-01A
14
2. Place pins on log #1 into holes in rear
bracket as shown in Figures 13 and 14.
3. Place pins on log #2 into slots in middle
bracket as shown in Figures 13 and 14.
INSTALLATION
PRESSURE TESTING HEATER GAS CONNECTIONS
1. Open equipment shutoff valve (see Figure
10, page 13).
2. Open main gas valve located on or near
gas meter for natural gas or open pro-
pane/LP supply tank valve.
3. Make sure control knob of heater is in the
OFF position.
4. Check all joints from equipment shutoff
valve to control valve (see Figure 11 or
12, page 13). Apply a noncorrosive leak
detection fluid to all joints. Bubbles form-
ing show a leak.
5. Correct all leaks at once.
6. Light heater (see
Lighting Instructions
on
page 17). Check all other internal joints
for leaks.
7. Turn off heater (see
To Turn Off Gas Ap-
pliance
, page 18).
WARNING: Failure to posi-
tion the parts in accordance
with these diagrams or failure
to use only parts specifically
approved with this heater may
result in property damage or
personal injury.
CAUTION: After installation,
and periodically thereafter,
check to ensure that no flame
comes in contact with any log.
With the heater set to high, check
to see if flames contact any log. If
so, reposition logs according to
the log installation instructions
in this manual. Flames contact-
ing logs will create soot.
It is very important to install the
logs exactly as instructed. Do
not modify logs. Use only logs
supplied with heater. Each log
is marked with a number. This
number will help you to identify
the logs when installing. Do not
place any decorative cinders on
logs or burner.
1. Remove nylon ties connecting the pack-
ing material to the logs. The log number
is marked on the back of each log.
INSTALLING LOGS
Holes for
Log #4
Holes for
Log #1
Holes for Log #3
Log #2
Log #1
Log #3
Slots for
Log #2
Holes for
Log #8
Figure 13 - Log Base and Chassis
Figure 14 - Log #1, #2 and #3