18
GB
The EC declaration of conformity for this appliance is available in the
Products
section of our
website
www.ceado.com
.
INSTALLATION
Comply with the
safety recommendations
indicated above and hereafter when installing the
appliance.
For the installation of the appliance, qualified personnel must be present who are able to check the
fineness of the grind.
1. Make sure that the mains voltage is as indicated on the rating label of the appliance and that
the electrical system is grounded and equipped with a switch.
2. Install the appliance in a
DRY, PROTECTED place
, far from water sprays and jets, heat
sources, open flames and inflammable substances.
Place the appliance on a
flat, horizontal, stable surface
where it cannot tip over.
3. Position the support fork, the collector and the bellows in their housing.
4. Connect the cable for connection with the control box 10, Fig. 2 with the connector 18, Fig. 3.
5. Connect the power cable to the socket 17, Fig. 3.
Before connecting the plug to the power socket, make sure that the ON-OFF switch (16 Fig. 3)
is in position “0” (OFF).
6. Plug the power cable into a socket protected by a suitably rated circuit breaker (MCB) or fuses.
Do not use an adaptor plug.
7. Stretch the power cable and the cable for connection with the control box out to full length.
Do
not
let them pass over sharp edges or hot surfaces.
Do not
let oil spill on them.
Do not
let the
power cable and the cable for connection with the control box hang loose from the counter on
which the appliance stands.
Summary of Contents for E37Z-Hero
Page 5: ...I 5 Fig 2 Fig 3 7 5 6 4 16 10 17 18 12 14 13 15 9 11...
Page 15: ...GB 15 Fig 2 Fig 3 7 5 6 4 16 10 17 18 12 14 13 15 9 11...
Page 25: ...25 F Fig 2 Fig 3 7 5 6 4 16 10 17 18 12 14 13 15 9 11...
Page 35: ...D 35 Abb 2 Abb 3 7 5 6 4 16 10 17 18 12 14 13 15 9 11...
Page 45: ...E 45 Fig 2 Fig 3 7 5 6 4 16 10 17 18 12 14 13 15 9 11...