CE -225 Mesh Conveyor Heat Tunnel Packaging Machine
Page
6
5.
Turn on the conveyor switch and adjust the conveyor know to adjust the
conveyor speed to the appropriate gear position.
6.
After the above operation is completed, let the machine run (preheat) for
5-10 minutes, then open the fan switch on the panel. The machine is now
ready for operation.