background image

CE -225 Mesh Conveyor Heat Tunnel Packaging Machine 

 

 

 

 

  

 

 

Page 

7

 

 

7.  

During the shrinking process, the speed and temperature can be adjusted 
according to the actual situation. Since  the temperature and speed are 
mutually restrained, it may be necessary to repeat the adjustment several 
times to meet the requirements. 

 

8.  

After the packaging is finished, the heating switch should be turned off 
first, and the conveying motor and the fan motor should continue to run 
for  about  10  minutes  before  turning  the  machine  off  to  increase  the 
service life of the machine. 

 

Summary of Contents for CE-225

Page 1: ...866 888 6327 sales clevelandequipment com 3889 E Raines Rd Memphis TN 38118 www clevelandequipment com CE 225 Mesh Conveyor Heat Tunnel Operation Manual...

Page 2: ...Packaging Machine Contents I Foreword 1 II Function 1 III Technical Parameters 2 IV Panel 3 V Instructions for Operation 4 VI Electrical Diagram 7 VII Component Diagram 9 VIII Troubleshooting 12 IX S...

Page 3: ...od is a popular and economical packaging method in the packing industry There is an increasing demand for its economical simple packing and aesthetically pleasing appearance The product is wrapped wit...

Page 4: ...2 III Technical Parameters Voltage 220V 50 60Hz Power 7 65 Kw Speed 0 10 m min Tunnel Size 800x400x200 mm 31 5 x 15 75 x 7 9 in Load 5Kg 11 lbs Machine size Low 1060x620x815 mm 41 75 x 24 5 x 32 in Ma...

Page 5: ...of Heating Pipe 3 Conveying Adjustment Adjust speed of conveying motor 4 Conveying Switch Controlling switch of conveying belt motor 5 Heating Switch Switch for controlling heating tube in shrinkage...

Page 6: ...according to the regulations before use and ensure that the contact is good good grounding can reduce the electric shock damage to the human body when a single phase ground fault occurs in the electr...

Page 7: ...CE 225 Mesh Conveyor Heat Tunnel Packaging Machine Page 5 4 Adjust the heating adjustment know to the appropriate position according to the shrinkage rate of the film...

Page 8: ...conveyor switch and adjust the conveyor know to adjust the conveyor speed to the appropriate gear position 6 After the above operation is completed let the machine run preheat for 5 10 minutes then o...

Page 9: ...e temperature and speed are mutually restrained it may be necessary to repeat the adjustment several times to meet the requirements 8 After the packaging is finished the heating switch should be turne...

Page 10: ...CE 225 Mesh Conveyor Heat Tunnel Packaging Machine Page 8 VI Electrical Diagram...

Page 11: ...CE 225 Mesh Conveyor Heat Tunnel Packaging Machine Page 9 VII Component Diagram...

Page 12: ...10 6 Curtain vertical bead 4 1 5 Q235 7 Curtain horizontal strip 2 1 5 Q235 8 Thermal insulation board 2 Group Weldment 9 Upper Liner 1 1 0 Galvanized Sheet 10 Frame 1 Group Weldment 11 Stainless Stee...

Page 13: ...servation Window Partition 1 Group Weldment 26 Observation Window Platform 1 Group Weldment 27 Observation Window Partition 1 Group Weldment 28 Guide Assembly 2 29 Furnace Shield 1 1 0 Galvanized Shee...

Page 14: ...mperature of Tunnel is Low Some heating pipes broken Replace Heat adjustment is too low Increase Temperature is set too low Reset One of the 3 fire wires is loose Re Connect Conveyor Motor Stops Runni...

Page 15: ...at Tunnel Packaging Machine Page 13 IX Shrink Film Temperature Guide Name Thickness mm Heating Time S Temperature C PVC 0 02 0 06 5 10 110 130 PP 0 02 0 04 6 12 130 170 PE 0 06 0 20 10 60 150 180 POF...

Reviews: