Photocopy
this page
for reuse.
52
DATE:
TECH:
VOLTAGE:
PH:
AMPS:
KW:
OPERATION CHECKOUT
INSTRUCTIONS: (QUALIFIED PERSONNEL ONLY)
SERIAL NUMBER:
MODEL NUMBER:
SLAVE PANEL ___ OF ___
CHECK EXTENSION PANELS AND RELATED EQUIPMENT
EXTENSION POWER OPERATION
(EACH EXTENSION PANEL)
FORM 000452
1500 W. Campus Drive Littleton, Colorado 80120
PH: 855.244.3128 FAX: 303-979-7350
www.fastraxind.com
NO. 3
NO. 6
Disconnect (lockout & tag) all power sources to control panel.
check heaters individually.
voltages and amperages below.
for each heater circuit on Form 0004ET.
Check voltage and test GFCI 120 volt outlet in dead front when present.
Turn power “On” and initiate full power to heaters. At master panel record load voltage and amperage
Turn panel heater thermostat above ambient temperature. Check heater. Return the thermostat to 40ºF.
Record ground fault test data below.
With dead-front open, turn disconnect to “on” position. Record input voltages below.
Turn on all heater load circuit breakers and turn panel on Full Power. At master panel record main load
Ground fault modules are factory set. No adjustments necessary. To view trip set-point, open plastic
cover (hinges up). Push “R” button twice, should read 30 mA.
Open dead-front panel and turn all heater load circuit breakers in panel to off position.
Measure and record the ohm resistance of each heater circuit. Record on form 0004ET.
If values vary more than 20% from REF OHMS, check heaters individually.
Test megohm values of each heater circuit. If any heater circuit falls below 20 megohms,
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
To test the ground fault press and hold the “T” button until read-out changes. Release the button and in
1 - 3 seconds the module will go into fault. Check that the pilot light (on dead front panel) turned off.
Wait 8 - 10 seconds, the GFI will reset.
GFI
mA
PILOT
LIGHT
PILOT
LIGHT
TEST
GFI
mA
TEST
NO. 1
NO. 4
NO. 2
NO. 5
NOTES
NOTES
LOAD AMPS: AB
INPUT VOLTS: AB
LOAD VOLTS: AB
BC
BC
BC
AC
AC
AC
VOLTS
VOLTS
AMPS
AMPS
AMPS
VOLTS
VOLTS
VOLTS
VOLTS
INSTALLATION CHECKOUT
INSTRUCTIONS
LOCK / SECURITY
SENSORS
FEED TO MASTER
FEEDER
ENCLOSURE
DRAWING ATTACHED
WIRING - GENERAL
SERVICE
STRUCTURE