b.9 Testing and commissioning
Before starting up the stove is necessary to test the installation to verify proper operation of
all parts including:
-
Connection to the smoke evacuation system-
-
The electrical connections
- Presence and efficiency of the air intake
The test is considered positive only after that all phases of the operation will be completed
without any faults happen.
The commissioning of the unit must be carried out by an authorized technician or the
warranty expires.