9
INSTALLATION PROCEDURE FOR STANDARD 22” X 16” OPENING
1. Carefully lift the appliance out of the packaging taking care not to
damage the ceramic components in the separate carton.
2. Remove the magnetic trim and store to one side
to prevent any damage.
3. Remove the louvered panel by lifting up and
pulling forwards.
4. Slacken the five machine screws on the top
retaining strip.
5. Unscrew the two securing screws from the
lower infill panel and remove the panel.
Tilt the glass forwards and slide out.
6. Cut the foam sealing strip (in plastic bag
supplied) to length and stick a continuous strip
down the two sides and across the top of the
radiant box. When the box is placed against a
flat surface the foam strip will form a seal around
the boxes flange.
7. Carefully lift the appliance into position in the
fireplace opening and check that the flange of the
radiant box fits flush against the sealing face with no gaps present.
8. Measure from the inside wall surface to the outside wall face, this is
Dimension X. Subtract
170mm
from Dimension X to calculate the length of
the outer flue. Mark the finished flue length onto the outer tube, measuring
from the terminal end.
9. Mark out four of the fixing holes. Remove the box and carefully drill
and fit “Rawl” plugs or see alternative fixing page 10.
10. Split the flue tubes by removing the machine screw and using tin snips or a fine cutting disc, cut through the
outer flue tube. Reassemble the flue tubes and measure 35mm from the cut end of the outer tube and mark the
inner tube. Cut the inner tube and then secure the flue to the rear of the fire box using the clamp provided.
11. Decide which opening of the appliance the gas supply will be entering the radiant box and remove the
relevant blanking plate. Feed the 8mm gas supply pipe through the opening from the rear of the fire and re-fit the
blanking plate around the supply pipe.
12. Slide the fire and flue into the fireplace opening ensuring the flue locates into the hole in the brickwork.
Ensure that the larger flue tube extends 25mm beyond the outer wall face when the fire is fully inserted into the
opening and that the machine screw is located at the top of the larger flue.
13. Secure the box into place using four screws (straight shank screws are recommended for marble).
14. From outside, fit the cover plate over the large flue tube and secure with the two screws provided.
Fig. 5
Infill panel
securing
screws (x 2)
Trim
Louvred
Panel
Machine
Screws (x 5)
X
X-170mm
25mm
Machine Screw
Fig. 6