—
— 113
Main Assembly 16
Ribbon frame assembly, ribbon frame spring, and ribbon frame fixing plate
1. Apply G-31 to the switching point of the ribbon frame on the ribbon switch lever. (A line of
lubrication: length 4 mm x wide 1 mm)
2. Apply G-31 to the tip of release point of the ribbon frame assembly on the base frame
assembly. (A point of lubrication: diameter 1 mm)
3. Apply G-31 to the each ribbon frame assembly mounting shaft (left and right) in the base
frame assembly. (A line of lubrication: length 2 mm x wide 1 mm)
4. Attach the shaft (A) and (B) of the base frame assembly to the ribbon frame assembly.
5. Attach the ribbon frame fixing plate into the groove in the right ribbon frame assembly
mounting shaft (A).
6. Hook the ribbon frame spring to (C) of the base frame assembly and (D) of the ribbon frame
assembly.
Ribbon frame fixing plate
Ribbon frame assembly
Ribbon frame spring
Apply G-31
(D)
(C)
Apply G-31
(A)
Apply G-31
Base frame assembly
(B)
Summary of Contents for UP-250
Page 1: ...EXTERNAL PRINTER FEB 2000 MODEL UP 250 without price TECHNICAL MANUAL ...
Page 95: ... 86 END END Yes No Action 4 Replace main PCB Replace printer OK Action 4 mechanism assembly ...
Page 136: ... 127 ...
Page 149: ... 140 Main Circuit Board Parts Layout ...
Page 150: ... 141 RS 232 Serial Interface Circuit Board Parts Layout ...
Page 151: ... 142 IEEE 1284 Parallel Interface Circuit Board Parts Layout ...
Page 152: ...RS 485 Serial Interface Circuit Board Parts Layout 143 ...
Page 160: ... 151 Case Unit Lubrication Points Diagram 4 G 31 4 G 31 3 G 31 3 G 31 ...
Page 163: ... 154 EXPLODED DIAGRAM FOR TM U200B U210B NO 1 ...
Page 164: ... 155 EXPLODED DIAGRAM FOR TM U200B U200PB U210B U210PB NO 2 ...