128
Chapter 12 Data Communication
4. Use the optional SB-90 9-9 pin connector to connect the SB-305 serial
cable to the BN Unit’s Mini Cradle.
•
All data communication settings must be made on the PV Unit, which is
the
host unit
. The BN Unit is the
terminal unit
.
To send data from the PV Unit to the BN Unit
1. After connecting the two units, turn on the PV Unit.
•
BN Unit power should still be off at this time.
2. Display the list view in a mode whose data can be sent with this setup.
•
This configuration supports transfer of Contacts (Business, Personal),
Memo, Schedule, To Do, and Reminder data.
•
Calendar and Expense Manager data cannot be transferred.
•
Contacts Untitled 1-5 data is transferred as Personal data.
•
Memo Untitled 1-5 data is transferred as Memo data (no category).
3. Tap
Menu Bar
to display the menu bar, and then tap
System
–
Data
communication
.
Host unit
(PV Unit)
Terminal unit
(BN Unit)
Mini Cradle
START
button
SB-90 9-9 pin connector
SB-305 serial cable