
3 - CONTROLS/INSTRUMENTS
FORWARD CONTROLS
Hand control levers and pedals
Arm and upperstructure swing left-hand
control lever
The speed of movement of the arm or the upperstructure
swing depends on the control lever tilt angle. In the inter-
mediate position two movements can be obtained simul-
taneously.
NOTE:
When the upperstructure swing control is re-
leased, the upperstructure may continue to rotate due to
the force of inertia. In this event, make allowance for the
extra movement by releasing the control slightly earlier.
VF3UDD-005
1
(1)
The arm extends.
(2)
The arm retracts.
(3)
The upperstructure turns to the left.
(4)
The upperstructure turns to the right.
298F39C8
2
Boom and bucket right-hand control lever
The speed of movement of the boom or the bucket de-
pends on the control lever tilt angle. In the intermediate
position two movements can be obtained simultaneously.
FIQCKA-006
3
(5)
The boom lowers.
(6)
The boom raises.
(7)
The bucket retracts (filling).
(8)
The bucket extends (dumping).
31DD6C78
4
3-9
Summary of Contents for CX235C SR
Page 6: ......
Page 18: ...1 GENERAL INFORMATION 1 12 ...
Page 29: ...2 SAFETY INFORMATION 825DC955_TU1 4 2 11 ...
Page 52: ...2 SAFETY INFORMATION 2 34 ...
Page 141: ...4 OPERATING INSTRUCTIONS 7 Try out all the controls in a safe open area 4 13 ...
Page 156: ...4 OPERATING INSTRUCTIONS 4 Operate the arm control to unhook the tool KKZVLU 024A 14 4 28 ...
Page 174: ...4 OPERATING INSTRUCTIONS 4 46 ...
Page 184: ...5 TRANSPORT OPERATIONS 5 10 ...
Page 284: ...8 SPECIFICATIONS Working range A31DCFA4 3 See next page for the values 8 8 ...
Page 286: ...8 SPECIFICATIONS 8 10 ...