
1 - 10
GENERAL INFORMATION
CASE TRAINING CENTER
AUGUST 2000
Cylinder
Control valve
Five section control valve for dipper, boom acceleration, swing, option and RH travel.
Four section control valve for dipper acceleration, bucket, boom and LH travel.
Load holding valve for boom and dipper.
Swing
Fixed flow, axial piston motor.
Automatic disc brake.
upperstructure swing speed - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -13.4 rpm
Travel
Two-speed, axial piston motor.
Automatic disc brake.
First speed - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.8 kph
Second speed - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5.5 kph
Gradeability - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 70% (35°)
Tractive force - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 10 000 daN
Attachment
Break-out force (standard/higher pressure (2-stage relief)) - - - - - - - - - - - - - - - - - - - - -/8640 daN
Crowd force (standard/higher pressure (2-stage relief)) - - - - - - - - - - - - - - - - - - - - - - -/6560 daN
Undercarriage
One-piece undercarriage with welded components.
Lubricated rollers and idler wheels.
Grease type track tension.
Ground pressure
with 500 mm track pads- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.39 bar
with 600 mm track pads- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.33 bar
with 700 mm track pads- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.29 bar
Weight
Engine361 kg
Hydraulic pump90 kg
Attachment control valve140 kg
Motor/reduction gear assembly99 kg
travel motor/reduction gear assembly144 kg
Boom cylinder108 kg
Dipper cylinder157 kg
Bucket cylinder93 kg
Boom cylinder
Dipper cylinder
Bucket cylinder
CX130
CX130
CX130
Barrel diameter
105 mm
115 mm
95 mm
Rod diameter
70 mm
80 mm
65 mm
Stroke
990 mm
1110 mm
880 mm
Summary of Contents for CX130
Page 1: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000...
Page 2: ......
Page 3: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 1 GENERALE INTRODUCTION...
Page 4: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 24: ......
Page 25: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 2 COMPONENTS LAYOUT...
Page 26: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 33: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 3 COMPONENTS...
Page 34: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 37: ...COMPONENTS CX130 3 3 CASE TRAINING CENTER AUGUST 2000 Hand remote control...
Page 39: ...COMPONENTS CX130 3 5 CASE TRAINING CENTER AUGUST 2000 Foot control...
Page 41: ...COMPONENTS CX130 3 7 CASE TRAINING CENTER AUGUST 2000 Auxiliary foot control...
Page 53: ...COMPONENTS CX130 3 19 CASE TRAINING CENTER AUGUST 2000 Pump...
Page 54: ...3 20 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Page 55: ...COMPONENTS CX130 3 21 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Page 56: ...3 22 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump control block follow...
Page 57: ...COMPONENTS CX130 3 23 CASE TRAINING CENTER AUGUST 2000 Pump control block...
Page 58: ...3 24 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Page 59: ...COMPONENTS CX130 3 25 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Page 60: ...3 26 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Page 61: ...COMPONENTS CX130 3 27 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Page 62: ...3 28 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Page 63: ...COMPONENTS CX130 3 29 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Page 68: ...3 34 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Boom savety valve H B C V...
Page 69: ...COMPONENTS CX130 3 35 CASE TRAINING CENTER AUGUST 2000 Dipper arm savety valve H B C V...
Page 71: ...COMPONENTS CX130 3 37 CASE TRAINING CENTER AUGUST 2000...
Page 73: ...COMPONENTS CX130 3 39 CASE TRAINING CENTER AUGUST 2000...
Page 74: ...3 40 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Page 75: ...COMPONENTS CX130 3 41 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Page 76: ...3 42 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Page 77: ...COMPONENTS CX130 3 43 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Page 78: ...3 44 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Page 79: ...COMPONENTS CX130 3 45 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Page 80: ...3 46 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Page 81: ...COMPONENTS CX130 3 47 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Page 82: ...3 48 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Page 83: ...COMPONENTS CX130 3 49 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Page 84: ...3 50 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Flow restrictor...
Page 85: ...COMPONENTS CX130 3 51 CASE TRAINING CENTER AUGUST 2000 Boom cylinder...
Page 88: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 103: ...DIAGNOSTIC SELECTION 4 15 CASE TRAINING CENTER AUGUST 2000...
Page 141: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 5 ELECTRICAL...
Page 142: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 143: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 190: ......
Page 191: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 6 HYDRAULIC CIRCUIT...
Page 192: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 193: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 215: ...HYDRAULIC CIRCUIT 6 22 CASE TRAINING CENTER AUGUST 2000...
Page 219: ...HYDRAULIC CIRCUIT 6 26 CASE TRAINING CENTER AUGUST 2000 Clamshell option Multipurpose option...
Page 223: ...HYDRAULIC CIRCUIT 6 30 CASE TRAINING CENTER AUGUST 2000 PUMP CX 130 Pump engine stopped...
Page 234: ......
Page 235: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 7 SETTINGS...
Page 236: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Page 260: ......