2000-8
Bur 5-5410
Issued 2-07
Printed in U.S.A.
STEP 36
BD07B178
Loosen clamps and remove upper radiator hose and
tube. Loosen the clamps and remove the hoses from
the after cooler. Loosen clamp and disconnect
radiator vent hose, disconnect cooling level sensor.
STEP 37
BD07B229
Attach lifting equipment to the lifting points on cooler
pack.
STEP 38
BD07B208
Remove the mounting bolts for the cooler pack.
STEP 39
Carefully raise and remove cooler pack from loader.
Lower cooler pack onto suitable platfor m and
disconnect lifting equipment.
STEP 40
BD07B209
Loosen the hose clamps, disconnect and remove the
after cooler tubes from the machine.
STEP 41
BD07B212
Loosen the hose clamps, disconnect the turbo inlet
hose. Loosen the clamp and disconnect the muffler
flex pipe from the turbo.