42 |
P a g e
cascadesciences.com
|
Tel. 503 847-9047
OPERATION
P
UT THE
C
HAMBER
U
NDER
V
ACUUM
Put the oven chamber under vacuum for at least 10 minutes
when first putting the oven into
operation in a new location to verify the integrity of the vacuum supply system.
The oven must be connected to a vacuum supply source prior to starting this procedure.
End of procedure
Evacuate the Oven Chamber
1.
Verify the Vacuum and Vent Valve controls are in the closed position
•
This protects your vacuum pump from exposure to streaming
atmosphere.
2.
Turn on your vacuum pump
3.
Open the oven Vacuum Valve
Turn the control counter clockwise
•
The Vacuum Gauge on the front panel should show
the chamber pressure decreasing.
•
The achievable vacuum level is dependent on
altitude above sea level as well as the vacuum
supply efficiency and the volume of outgassed
byproducts. See page 47.
Holding at Vacuum
Continue evacuating the chamber throughout the baking application
to vent outgassed byproducts.
Backfilling the Oven Chamber
4.
Close the Vacuum Valve
Turn the Vacuum Valve control back to the closed position (clockwise) to
protect the vacuum pump from extended exposure to streaming
atmosphere.
•
The pump may remain on.
5.
Slowly open the Vent Valve
The chamber pressure gauge will count upward to zero.
Chamber restored
to room pressure
VACUUM
VENT
Summary of Contents for CVO-2-HT
Page 1: ...Vacuum Ovens CVO 2 HT CVO 5 HT Installation Operation Manual...
Page 6: ...6 P a g e cascadesciences com Tel 503 847 9047 TABLE OF CONTENTS...
Page 8: ...8 P a g e cascadesciences com Tel 503 847 9047 CERTIFICATIONS...
Page 12: ...12 P a g e cascadesciences com Tel 503 847 9047 UNIT SPECIFICATIONS...
Page 16: ...16 P a g e cascadesciences com Tel 503 847 9047 INTRODUCTION...
Page 22: ...22 P a g e cascadesciences com Tel 503 847 9047 RECEIVING YOUR OVEN...
Page 32: ...32 P a g e cascadesciences com Tel 503 847 9047 GRAPHIC SYMBOLS...
Page 71: ...71 P a g e cascadesciences com Tel 503 847 9047 REPLACEMENT PARTS...
Page 72: ......