background image

8

6892487-R3

CL5420.eps

CL5418.eps

CL5419.eps

LOAD HANDLING – TIPPING CLAMPS

A) Tilt mast to square 

pads with load.

Raise load high 

enough for the load 

to fully tip forward.

Tip load forward.

C) Clamp load.

B) Drive forward, position 

load against backrest.

1

2

3

Reference line

for easy height

positioning.

CL5421.eps

Summary of Contents for Bulk Box Handler Series

Page 1: ...ding Arm Clamps Sideshifting Non Sideshifting Revolving Turnafork Turnaload Bulk Box Handler Marble Handler Tipping Folding Forks Independent Arm Control Fork Positioner PERATOR S GUIDE O Cascade is a...

Page 2: ...load handling procedures for most products Cascade recommends developing a site specific operating procedure relative to products be handled specific operations and local safety guidelines Page Introd...

Page 3: ...tachment Be sure you know and understand all operating procedures and safety precautions If you have any questions or don t understand a procedure ask your supervisor Emphasize Safety Most accidents a...

Page 4: ...under load No reaching through mast No riders P P With load No load RAMPS Raise Tilt Traveling Empty CL1210 eps Wet floors Slow for two way traffic Sound horn slow at intersection Sound horn slow at c...

Page 5: ...ds on top must be stable and safely arranged prior to lifting and traveling Backrest required where possibility exists for load to fall rearward See OSHA 1910 178 and ANSI B56 1 Page 15 Prior to lift...

Page 6: ...or leaks Lower hook engagement Fasteners Pad edges surfaces Safety decals nameplate Check items each day Report problems to your supervisor Check clamp force prior to each operational shift Refer to a...

Page 7: ...tton B Sideshift Right B Clamp Arms Close Forks Press knob button TURNAFORK Close arms to change function AUXILIARY VALVE FUNCTIONS Tilt forward Hoist down CL1190 eps B C C D A REVOLVING CLAMPS FORK P...

Page 8: ...krest C Align bottom of load with bottom of pad edges Transport load centered not sideshifted Tilt back for transport CL1198 eps CL1199 eps CL0029 eps CL1200 eps CL0028 eps 12 in 30 cm 3 4 LOAD HANDLI...

Page 9: ...12 in 30 cm 3 4 LOAD HANDLING DRUM CLAMPS A Align drums squarely before clamping all drums same size B Use correct clamping force Position contact pads under upper chines Tilt back for transport FORWA...

Page 10: ...NDLING TIPPING CLAMPS A Tilt mast to square pads with load Raise load high enough for the load to fully tip forward Tip load forward C Clamp load B Drive forward position load against backrest 1 2 3 R...

Page 11: ...L6939 eps LOAD HANDLING FOLD UP FORKS A Tilt mast to position forks parallel to floor B Drive forward position load against bumper 12 in 30 cm Transport load centered USING FOLD UP FORKS 3 4 Tilt back...

Page 12: ...allel to floor USING WITH FORKS FOLDED UP B Drive forward position load against forks and bumper 12 in 30 cm Transport load centered Fold up forks 3 4 Tilt back for transport LOAD HANDLING FOLD UP FOR...

Page 13: ...ing Check ground clearance Tilt back if 4 Clamp mounting is used Check overhead clearance Center of Rotation Lateral Offset Position the load center of gravity as close as possible to the center of ro...

Page 14: ...045 eps CL1193 eps A Make sure container or unitized load has captive fork slots before rotating If elevated loads must be rotated rotate slowly B Position forks to outside edge of slots LOAD HANDLING...

Page 15: ...180 Adjust arm Rotate 180 and reclamp CLAMPS WITH TOP ARM SHUTOFF CL0271 eps CL2486 eps CL2485 eps LOAD HANDLING TURNALOAD CLAMP A Drive forward pick up load Top Arm Pick up empty pallet rotate 180 to...

Page 16: ...osition forks parallel to floor B Drive forward position load with arm pads 12 in 30 cm 3 4 Transport load centered Tilt back for transport CL0046 eps Position load parallel to ground before rotating...

Page 17: ...els Dockplate required CL3148 eps CL3147 eps 4 5 Lower the bundle to just rest on the ground Secure the load with overhead crane straps Take up the slack with the overhead crane to support the bundle...

Page 18: ...16 6892487 R3 6 7Carefully raise and transport the bundle CL3149 eps Remove the security strap from the arms Back the Marble Handler away from the bundle LOAD HANDLING MARBLE HANDLER CONTINUED...

Page 19: ...LESHOOTING IF LOAD IS SLIPPING Check for bent contact pads or forks straighten or replace Check hydraulics for low supply pressure Refer to Service Manual Check for worn contact pad surfaces replace s...

Page 20: ...tions shall be made at least daily When industrial trucks are used on a round the clock basis they shall be examined after each shift Defects when found shall be immediately reported and corrected a G...

Page 21: ...BLANK...

Page 22: ...1600 60A Steel Road Sparton Kempton Park South Africa Tel 27 11 975 9240 Fax 27 11 394 1147 ASIA PACIFIC Cascade Japan Ltd 2 23 2 Chome Kukuchi Nishimachi Amagasaki Hyogo Japan 661 0978 Tel 81 6 6420...

Reviews: