11
STEP 7
1.
Remove the pre-installed screws (I-2) on the Pedal post first.
2.
Attach the Lower handlebar (E-1 R/L) to the left and right pedal post (I-1), and then close the
cover (M-4 & M-5) using screws (P-5 & I-2).
3.
Assemble the Right pedal (M-9) onto the Pedal post (I-3) with 2 Knobs (P-16), 2 Spring
washers (P-18),2 Bushings (P-19) and 2 Carriage bolts (P-17).
4.
Assemble the Left pedal (M-6) onto the Pedal post (-3) with 2 Knob (P-16), 2 Spring washers
(P-18),2 Bushings (P-19) and 2 Carriage bolts (P-17).
`
STEP 8
Slide the Upper handlebar post (C-1,C-4) (R/L) into the Lower handlebar (E-1) and then
fix with the eight Allen bolts (P-8)
M5*14
M3*25L
M6*P1.0*40L
M6
4*
2*
4*
1*
Ø
6
Ø7*Ø12*25
E-1
M8x12L
8x
1x