CARVIN
®
SILVER SERIES ABOVE-GROUND POOL | USER MANUAL
9
GEOTEXTILE INSTALLATION
STEP 1
Deploy the geotextile fabric.
STEP 2
Water the geotextile fabric to spread it out and keep it in place.
LINER INSTALLATION
REFER TO LINER FACTORY INSTRUCTION BEFORE FOLLOWING THIS STEP.
The liner dimensions are usually smaller than those of the pool frame. It is
recommended to spread the liner in the sun for an hour or two before starting
the installation so that the liner can warm up. It will stretch better under these
conditions and facilitate the installation.
Select a liner that meets APSP-4 liner performance requirements.
Do not attempt to install the liner on a cold day without sun.
Avoid to fill the swimming pool with very cold water.
CARVIN
®
pool can be install with J-Hook and Overlap liner.
*See the retailer for the liner coping clamp strip for the Overlap liner.
STEP 1
Open the liner box.
Do not use sharp tools to open the box.
IMPORTANT
Pool wall
Top rail
Top rail
Top rail
(second)
Liner
Pool wall
Top rail
(second)
Liner
Pool wall
Top rail
Top rail
Top rail
(second)
Liner
Pool wall
Top rail
(second)
Liner
J-Hook
Overlap*
STEP 2
Take the line out of its box. Unfold it and spread it out under the sun so it can warm
up and stretch.
STEP 3
Inspect the liner, the seams and the whole surface to make sure there are
no holes.
STEP 4
Spread the liner inside the pool with design pattern up. The seam at the bottom
of the liner should be placed in the center of the basin. All other seams must form
parallel straight lines.
Remove your shoes to prevent damaging the bottom of
the liner.
IMPORTANT
Design pattern up
+16°
(61°F)
STEP 5
Make sure the liner is free of wrinkles at the bottom of the pool.