5. The unit pauses and then displays IN PROGRESS.
6. When the test is complete, DONE appears.
7. When all desired parameters have been tested, press the
(Menu Up) button to end the test.
The Checkout tests can all be performed at the time of installa-
tion or at any time during the operation of the system as a test
that the system is operable.
TROUBLESHOOTING
Alarms
The economizer module provides alarm messages that display
on the 2-line LCD.
NOTE: Upon power up, the module waits 60 minutes before
checking for alarms. This allows time for all the configured devic-
es (e.g. sensors, actuator) to become operational. The exception is
the SAT sensor which will alarm immediately.
If one or more alarms are present and there has been no keypad
activity for at least 5 minutes, the Alarms menu displays and
cycles through the active alarms.
You can also navigate to the Alarms menu at any time.
Clearing Alarms
Once the alarm has been identified and the cause has been re-
moved (e.g. replaced faulty sensor) the alarm can be cleared
from the display.
To clear an alarm, perform the following:
1. Navigate to the desired alarm.
2. Press the
(Enter) button.
3. ERASE? displays.
4. Press the
(Enter) button.
5. ALARM ERASED displays.
6. Press the
(Menu up/Exit) button to complete the
action and return to the previous menu.
NOTE: If the alarm still exists after clearing it, it is redisplayed
within 5 seconds.
PremierLink™ Controller (Factory Option)
For details on operating 50TC**07-16 units equipped with the
factory-installed PremierLink controller option, refer to the
PREMIERLINK Retrofit Rooftop Controller Version 3.x In-
stallation, Start-up and Configuration Instructions.
See Fig. 97-100 for wiring diagrams.
RTU Open Controller (Factory-Installed Option)
For details on operating 50TC**07-16 units equipped with the
factory-installed RTU Open Controller option, refer to the
Fac-
tory-Installed Option RTU Open Multi-Protocol Controller
Controls, Start-Up, Operation, and Troubleshooting
manual.
See Fig. 101-107 for wiring diagrams.
CAUTION
EQUIPMENT DAMAGE HAZARD
Failure to follow this caution may result in equipment damage.
Be sure to allow enough time for compressor start-up and
shutdown between checkout tests so that you do not short-
cycle the compressors.
Summary of Contents for WeatherMaker 50TC07 Series
Page 4: ...4 Fig 2 Dimensional Drawing for Units Built on and After 4 15 19 Size 07 ...
Page 5: ...5 Fig 3 Dimensional Drawing for Units Built Prior to 4 15 19 Size 07 ...
Page 6: ...6 Fig 4 Corner Weights and Clearances Size 07 ...
Page 7: ...7 Fig 5 Base Rail Details Size 07 ...
Page 8: ...8 Fig 6 Thru the Base Charts Size 07 ...
Page 9: ...9 Fig 7 Unit Dimensional Drawing Size 08 09 12 ...
Page 10: ...10 Fig 7 Unit Dimensional Drawing Size 08 09 12 cont ...
Page 11: ...11 Fig 8 Unit Dimensional Drawing Size 14 ...
Page 12: ...12 Fig 8 Unit Dimensional Drawing Size 14 cont ...
Page 13: ...13 Fig 9 Unit Dimensional Drawing Size 16 Unit ...
Page 14: ...14 Fig 9 Unit Dimensional Drawing Size 16 Unit cont ...
Page 19: ...19 Fig 14 Roof Curb Details Size 16 Unit ...
Page 26: ...26 Fig 34 50TC 07 Control Wiring Diagram ...
Page 27: ...27 Fig 35 50TC 07 Power Wiring Diagram ...
Page 28: ...28 Fig 36 50TC M08 12 Control Wiring Diagram ...
Page 29: ...29 Fig 37 50TC D E Wiring Diagram 08 14 Size Units ...
Page 30: ...30 Fig 38 Single Stage Cooling without VFD Power Wiring Diagram Sizes 08 12 ...
Page 31: ...31 Fig 39 2 Stage Cooling with VFD Power Wiring Diagram Sizes 08 12 ...
Page 32: ...32 Fig 40 2 Stage Cooling with VFD Power Wiring Diagram Size 14 ...
Page 33: ...33 Fig 41 50TC 16 Wiring Diagram ...
Page 34: ...34 Fig 42 2 Stage Cooling with VFD Power Wiring Diagram Size 16 ...
Page 35: ...35 Fig 43 50TC 07 Units Wiring Diagram with Humidi MiZer System Option ...
Page 36: ...36 Fig 44 50TC 08 14 Units Wiring Diagram with Humidi MiZer System Option ...
Page 37: ...37 Fig 45 50TC 16 Wiring Diagram with Humidi MiZer System Option ...
Page 69: ...69 Fig 97 Typical PremierLink Control Wiring Diagram Size 07 Shown ...
Page 70: ...70 Fig 98 50TC M08 12 PremierLink Control Wiring Diagram ...
Page 71: ...71 Fig 99 Typical PremierLink Control Wiring Diagram Dual Compressor Sizes 08 12 shown ...
Page 72: ...72 Fig 100 Typical PremierLink Control Wiring Diagram with Humidi MiZer System Option ...
Page 73: ...73 Fig 101 Typical RTU Open Controller Wiring Diagram 50TC 07 Units ...
Page 74: ...74 Fig 102 50TC M08 12 RTU Open Controller Wiring Diagram ...
Page 75: ...75 Fig 103 Typical RTU Open Controller Wiring Diagram 50TC D E08 14 Units ...
Page 76: ...76 Fig 104 RTU Open Controller Wiring Diagram 50TC 16 Unit ...
Page 83: ...83 Fig 113 UltraTech Scroll Compressor ...
Page 84: ......
Page 85: ......