![background image](http://html1.mh-extra.com/html/carrier/tyler-advantage-nlbn/tyler-advantage-nlbn_installation-and-service-manual_2563781011.webp)
Installation & Service Manual
NLBR, NLBN, NLBS
November, 2005
Page 11
Bottom and End Close-off Installation
Kickplate, optional rear bottom and end
closeoffs have spring clips on their back
sides that secure to the pipe legs.
NOTE
Optional rear bottom close-offs do not
require joint trim.
1. Before installing kickplates on a multiple
case lineup, snap a joint trim (2) over
the top and bottom of one end of each
kickplate (3).
2. Lineup each kickplate (3) and/or optional
rear bottom close-off (4) and push to
se-cure the spring clips to the legs (5).
3. Slide joint trims (2) over the case-to-case
joints.
4. Position end close-offs (6) over the end
of the kickplate (3) and/or optional rear
bottom close-off (4) and push until the
spring clips secure to the legs (5).
Trim & NSF Thermometer Installation
The joint trim and mounting hardware are
shipped loose. Trim includes top joint trim
(1), rear upper joint trim (2), rear lower joint
trim (3), horizontal joint trim (4), front kick-
plate joint trim (5), front lower cladding joint
trim (6) and front upper cladding joint trim (7).
Horizontal joint trim covers gaps between the
cases. The trim is glued onto the shipping
cardboard. It is applied after running beads
of caulking on the edges of the cases. Sheet
metal screws can be used for additional
securing.
Patch end trim is shipped factory installed. If
field installation is required, be sure the patch
end is pulled up enough to fit snuggly against
the sealing tubing on the inside of the case.
The patch end must seal tightly against the
lift glass wiper to ensure proper operating
temperatures.
The NSF case thermometer and bracket
assembly (8) is shipped loose with the case.
After removing the thermometer and bracket
assembly from the shipping packaging,
position bracket over left horizontal joint trim
and case-to-case joint where the joint trim is
notched out. Make sure the bracket is posi-
tioned to the front of the case, flush with the
top and left inside edge of the bottom case
end welds. Secure thermometer bracket
with two screws in the pre-drilled holes.
Summary of Contents for TYLER Advantage NLBN
Page 5: ...Installation Service Manual NLBR NLBN NLBS April 2008 Page 5...
Page 7: ...Installation Service Manual NLBR NLBN NLBS April 2008 Page 7...
Page 13: ...April 2007 Page 13 NLBR NLBN Domestic Export 50 Hz Case Circuits 59 77 Cases...
Page 14: ...Page 14 April 2007 NLBS Domestic Export 50 Hz Case Circuits 59 77 Cases...
Page 25: ...Installation Service Manual NLBR NLBN NLBS November 2005 Page 25...
Page 27: ...Installation Service Manual NLBR NLBN NLBS November 2005 Page 27...