• Remove the service cover of the outdoor unit, and connect the end of the connection cord with screws to the terminal block. ( Refer to wiring diagram inside
the top cover and caution label on the service cover)
• When connections are completed, fasten the connection cord with the cable clamp and reinstall the service cover. ( Figure. 20 )
OUTDOOR UNIT WIRING
For Cooling Only Model
For Heat Pump Model
NOTE
• The air conditioner always requires grouding
• Be sure to comply with local codes on running the wire from the indoor unit to the outdoor unit.
• Every wire must be connected firmly.
• Use connection cable H07(H05,A07,A05)RN-F 1.5mm, synthetic rubber insulation with Neoprene coating,
according to EN(IEC) 60335-2-40 and HD277.S1 standards.
• During installation, proceed first with refrigerant connections between indoor and outdoor units, and only then
make the electrical ones;similarly, when disassembling, disconnect the electrical wiring first and only then open refrigerant connections.
• Ground connection between ID and OD is made through refrigerant pipes.
• Unit must be installed according to applicable national installation standards.