Fig. 3 — 36SL Base Unit

VERTICAL UNIT INSTALLATION

Step 1 — Install Wall Mounting Strip and Hang
Base Unit (see Fig. 4)

1. Determine required length of mounting strip. Allow for

length  of  enclosures  and  runouts  to  be  used. 

Maximum

unsupported length of Carrier enclosures is 2-in. on

either side.

2. Locate strip per job prints. Install straight and level using

field-supplied fasteners through alternate and end holes.

Shim if necessary.

3. Install separate mounting strip above base unit strip for

hanging 36SC or 36ST enclosures if used.

4. Mark enclosure vertical center line on wall near mount-

ing strip.

5. Remove base unit from carton. Retain carton and place

over unit after installation to protect from dirt.

6. Remove unit protective packing

.

7. Do not remove lint screen clips (taped to condensate pan)

or  tee  and  connector  (tape  to  side  of  slave  unit)  until
required.

8. Install  two  No.  10-24  bolts  (factory-supplied)  through

two No. 10-24 speed nuts provided. (These, or any other
suitable means, will be used for unit leveling.)

9. Mark base unit vertical center line on unit.

10. Determine  from  job  prints  or  certified  prints  relative

position of base unit with respect to enclosure.

11. Hang base unit on wall-mounting strip, using center lines

for reference.

12. Level  unit  by  adjusting  two  No.  10-24  bolts  (or  other

means selected).

Fig. 4 — Hanging Base Unit

Step 2 — Make Air Connections (see Fig. 5)

1. Remove end plug from shipping position. 

Do not discard.

2. Air connections:

Apply sealer (3M Scotch Seal 800 or equivalent) to end

plug and air transition fitting. Install plug and fitting to
plenum  connection.  Connect  duct  to  transition  fitting;

seal  connection  with  duct  sealer. 

CAUTION: Excessive

duct sealer may interfere with damper movement. After
applying sealer, check damper for free travel by rotating

adjusting screw (See Step 8 — Balance System) with

1

/

8

-in. Allen wrench.

3. Check that all tubing connections are tight.

Fig. 5 — End Plug Fittings

Summary of Contents for INDUCTION AIR TERMINALS 36S

Page 1: ...nclosure 7 Coil Reversal 8 GENERAL These units are controlled by varying water flow through coil Follow installation steps in sequence suggested Each step in cludes figure s and procedures required fo...

Page 2: ...8 Install two No 10 24 bolts factory supplied through two No 10 24 speed nuts provided These or any other suitable means will be used for unit leveling 9 Mark base unit vertical center line on unit 1...

Page 3: ...1 Position recirculation grille mounting frame using holes provided Install recirculation grille panel to grille frame 2 Install discharge grille frame and removable grille sec tions Field fabricated...

Page 4: ...3 16 in holes for attaching runout 2 Cut runout enclosure and enclosure panel to desired length 3 Fit runout enclosure into slots of one end frame 4 Insert enclosure panel into end frame slots 5 Fit s...

Page 5: ...sts on lower flange of end frame 6 Hang assembly on wall mounting strip and adjacent to unit enclosure Stiffener bracket lip must support bottom of runout 7 Attach end frame to unit enclosure with two...

Page 6: ...d adjacent to unit enclosure 5 Attach end frame to unit enclosure with one No 8 sheet metal screw field supplied Step 8 Balance System see Fig 14 1 Remove construction debris from unit Remove protec t...

Page 7: ...ve packing 2 Remove four No 10 16 x 1 2 in screws taped to inside of enclosure end panel 3 Remove Z bars from shipping position fasten to unit with screws and clips provided Install ceiling mounting p...

Page 8: ...S 1SI Carrier Corporation 2018 Coil Reversal see Fig 17 Do not reverse coils having vent fittings except 36SL SM SC ST To reverse coils without vent fittings 1 Remove sheet metal screws fastening cond...

Reviews: