background image

5

COLUMN-TO-COLUMN WITH SHELVING (SEE FIG. 11)
1. Drill two 

3

/

16

-in. holes for attaching runout.

2. Cut runout enclosure, back panel, and shelving to desired

length. 

Maximum unsupported shelf length is 3 ft.

3. Fit runout enclosure into slots of 2 end frames.
4. Install  end  panels  flush  with  front  of  runout  enclosure,

leaving  space  at  bottom  to  insert  shelving.  Fasten  end

panels to runout enclosure with U-clips.

5. Insert  shelving  below  end  panels,  with  flanges  turned

down. Shelving rests on lower flange of end frame.

6. Hang  assembly  on  wall  mounting  strip  and  adjacent  to

unit enclosure. Stiffener bracket lip must support bottom

of runout.

7. Attach end frame to unit enclosure with two No. 8 sheet

metal screws (field-supplied).

ENCLOSURE WITH  SINGLE  OR  DUAL  RUNOUT  (SEE

FIG. 12)
1. Drill two 

3

/

16

-in. holes for attaching runout.

2. Cut runout enclosure to desired length; fit into slots of 2

end frames.

3. Hang  assembly  on  wall  mounting  strip  and  adjacent  to

base  unit  enclosure.  Stiffener  bracket  lip  must  support

bottom of runout.

4. Attach end frame to base unit enclosure with one No. 8

sheet metal screw (field-supplied).

Fig. 11 — Column-to-Column Enclosure with Shelving

Summary of Contents for INDUCTION AIR TERMINALS 36S

Page 1: ...nclosure 7 Coil Reversal 8 GENERAL These units are controlled by varying water flow through coil Follow installation steps in sequence suggested Each step in cludes figure s and procedures required fo...

Page 2: ...8 Install two No 10 24 bolts factory supplied through two No 10 24 speed nuts provided These or any other suitable means will be used for unit leveling 9 Mark base unit vertical center line on unit 1...

Page 3: ...1 Position recirculation grille mounting frame using holes provided Install recirculation grille panel to grille frame 2 Install discharge grille frame and removable grille sec tions Field fabricated...

Page 4: ...3 16 in holes for attaching runout 2 Cut runout enclosure and enclosure panel to desired length 3 Fit runout enclosure into slots of one end frame 4 Insert enclosure panel into end frame slots 5 Fit s...

Page 5: ...sts on lower flange of end frame 6 Hang assembly on wall mounting strip and adjacent to unit enclosure Stiffener bracket lip must support bottom of runout 7 Attach end frame to unit enclosure with two...

Page 6: ...d adjacent to unit enclosure 5 Attach end frame to unit enclosure with one No 8 sheet metal screw field supplied Step 8 Balance System see Fig 14 1 Remove construction debris from unit Remove protec t...

Page 7: ...ve packing 2 Remove four No 10 16 x 1 2 in screws taped to inside of enclosure end panel 3 Remove Z bars from shipping position fasten to unit with screws and clips provided Install ceiling mounting p...

Page 8: ...S 1SI Carrier Corporation 2018 Coil Reversal see Fig 17 Do not reverse coils having vent fittings except 36SL SM SC ST To reverse coils without vent fittings 1 Remove sheet metal screws fastening cond...

Reviews: