PACKING
5.3 Commissioning
In order to achieve optimum performance, the unit must be:
a)
Place the cell in a well ventilated room, away from heat sources .
b)
Check that the unit has adequate aspirating and extracting power.
5.4 Area surrounding the unit
In order to allow it to work properly and to facilitate its maintenance in safety con-
ditions, the unit should be installed providing the minimum spatial requirements
for opening the unit, indicated in figs 5.
E
nsure that no damage has occurred to the unit or the equipment it contains
during transportation, particularly to the components fixed to the electric control
panel door and to the refrigerating system pipes. To install the unit, proceed as
indicated in the diagrams, taking special care to level the unit (fig.7).
Connect the condensing unit to its evaporator following the diagrams of the fig.7
and using pipes with the correct diameter as indicated in the enclosed tables.
GB
D
F
I
Carrier
9
fig.6
Mod.
A
B
C
Kg
CU401-O
670
1350
810
56
CU451/501-O
780
1850
865
89
CU631-O
880
2000
1100
114
A
B
C
6. ASSEMBLY AND PREPARATION PRIOR TO COMMISSIONING
fig. 7
PIANO PAVIMENTO
fig. 7.a
-Section of suction
line in an installation
having the compres-
sor sited underneath
heevaporator
Insulate the whole
suction line
FLOOR PLANE