![Carrier BW9 Series Installation Instructions Manual Download Page 17](http://html.mh-extra.com/html/carrier/bw9-series/bw9-series_installation-instructions-manual_2562164017.webp)
17
c. Follow the antifreeze manufacturer’s instructions on
determining proper ratio of antifreeze to water for the
expected low temperature conditions, and for
maintaining the quality of the antifreeze solution from
year to year. Improperly maintained antifreeze
solutions will gradually lose their ability to protect the
aluminum boiler from corrosion.
d.
The recommended premixed antifreeze solution is
INTERCOOL NFP--50
. This product is sold direct to
installing contractors by the antifreeze manufacturer.
Please contact Interstate Chemical Company, New
York Customer Service at 1--800--422--2436 to
purchase. Use of an alternate manufacturer’s premix
antifreeze is acceptable if the product specifications are
compatible with those of the recommended premix
antifreeze and the antifreeze is compatible with type
356 T6 aluminum. Use of incompatible antifreeze
could damage the heat exchanger and could void
product warranty.
The antifreeze must be maintained per the
specifications of the manufacturer. Failure to do so
could result in the warranty being voided. Follow the
antifreeze manufacturer’s instructions on determining
the proper ratio of antifreeze to water for the expected
low temperature conditions and for maintaining the
antifreeze solution from year to year.
e.
DO NOT USE AUTOMOTIVE ANTIFREEZE
, as
the type of corrosion inhibitors used will coat the
boiler’s heat transfer surfaces and greatly reduce
capacity and efficiency.
f. Use of antifreeze in any boiler will reduce heating
capacity by as much as 10--20 percent, due to differing
heat transfer and pumping characteristics. This must be
taken into consideration when sizing the heating
system, pump(s) and expansion tank. Consult
antifreeze manufacturer’s literature for specific
information on reduced capacity.
g. Water content of the boiler is 2.6 gallons (10 liters).
STEP 2
—
Filling Boiler with Water and Purging Air for
Systems with Diaphragm Type Expansion Tanks
Refer to appropriate “Near Boiler Piping” diagrams.
1. Close all zone service valves on the supply and return
piping. Open the feed valve and fill boiler with water.
Make sure air vent is open. Hold relief valve open until
water runs air free for five seconds to rapidly bleed air
from boiler, then let the relief valve snap shut.
2. Open the zone service valve on the
supply
pipe for the
first zone. Open the purge valve on the first zone. Feed
water will fill the zone, pushing air out the purge valve.
Close the purge valve when the water runs air free. Close
the zone service valve.
3. Repeat step 2 for all remaining zones.
4. Open all service valves. Any air remaining trapped in the
return lines between the service valves and the boiler will
be pushed towards the air vent when the boiler is placed in
operation.
5. Inspect piping system. Repair any leaks immediately.
STEP 3
—
Filling Boiler with Water and Purging Air for
Systems with Conventional Closed Type Expansion Tanks
Refer to appropriate “NEAR BOILING PIPING” diagrams.
1. Close all zone service valves on the supply and return
piping and close the expansion tank service valve. Drain
expansion tank. Open the feed valve and fill boiler with
water. Hold relief valve open until water runs air free for
five seconds to rapidly bleed air from boiler, then let the
relief valve snap shut.
2. Open the zone service valve on the supply pipe for the
first zone. Open the purge valve on the first zone. Feed
water will fill the zone, pushing air out the purge valve.
Close the purge valve when the water runs air free. Close
the zone service valve.
3. Repeat step 2 for all remaining zones.
4. Open the expansion tank service valve and the tank vent.
Fill the tank to the proper level and close the tank vent.
Remove the handle from the expansion tank service valve
so the homeowner doesn’t accidentally close it.
5. Open all service valves. Any air remaining trapped in the
return lines between the service valves and the boiler will
be pushed towards the expansion tank when the boiler is
placed in operation.
6. Inspect piping system. Repair any leaks immediately.
NOTE
: DO NOT use stop leak compounds. Leaks in threaded
connections in the aluminum boiler sections must be
repaired
immediately. Aluminum threads will not seal themselves.
DIAGNOSTIC INDICATOR LAMPS
POWER
PURGE
IGNITER
VALVE
FLAME
A
B
C
D
E
UT-1013 INTEGRATED BOILER CONTROL
40 VA TRANSFORMER CONTROL
CONTROL PANEL
A04062
Fig. 18
---
Indicator Lights