
CHECKLIST
1. Put away tools and instruments, and clean up debris.
2. Check SW-1 through SW-4 after completing installation to
ensure desired settings for thermostat type (SW-1 and SW-2)
and blower off delay (SW-3 and SW-4).
3. Verify manual reset switches have continuity.
4. Ensure blower and gas control access doors are properly
installed.
5. Cycle test furnace with room thermostat.
6. Check operation of accessories per manufacturer’s instruc-
tions.
7. Review User’s Manual with owner.
8. Leave literature packet near furnace.
22
Summary of Contents for 58TUA
Page 23: ...23 ...