background image

0.5 psig (14-in. wc), close the manual shut-off valve located on the
gas valve before the test. It is recommended that the ground joint
union be loosened before pressure testing.

After all connections have been made, purge the lines and check
for gas leakage with regulated gas supply pressure.

Step 8—Electrical Connections

115-V WIRING

Refer to the unit rating plate or Table 6 for equipment electrical
requirements. The control system requires an earth ground for
proper operation.

Do not connect aluminum wire between disconnect switch
and furnace. Use only copper wire.

Make all electrical connections in accordance with the current
edition of the National Electrical Code (NEC) ANSI/NFPA
70-1993, and any local codes or ordinances that might apply. For
Canadian installations, all electrical connections must be made in
accordance with Canadian Electrical Code CSA C22.1, or authori-
ties having jurisdiction.

NOTE:

Proper polarity must be maintained for 115-v wiring. If

polarity is incorrect, control center fault code indicator light will
flash rapidly and furnace will not operate.

The cabinet MUST have an uninterrupted or unbroken ground
according to NEC ANSI/NFPA 70-1990 and Canadian Elec-
trical Code CSA C22.1 or local codes to minimize personal
injury if an electrical fault should occur. This may consist of
electrical wire or conduit approved for electrical ground when
installed in accordance with existing electrical codes. Do not
use gas piping as an electrical ground. Failure to follow this
warning could result in electrical shock, fire, or death.

24-V WIRING — Make field 24-v connections at the 24-v termi-
nal strip. (See Fig. 11.) Connect terminal Y as shown in Fig. 12 for
proper operation in cooling mode. Use AWG No. 18 color-coded
wire only.

The 24-v circuit contains an automotive-type, 3-amp fuse located
on the main control board. Any direct shorts during installation,
service, or maintenance could cause this fuse to blow. If fuse
replacement is required, use ONLY a 3-amp fuse of identical size.

ACCESSORIES

1. Electronic air cleaner (EAC)

Two quick-connect terminals, marked EAC-1 and EAC-2, are
provided for EAC connection. (See Fig. 11.) These terminals
are energized with 115v (1.5-amp maximum) during blower
motor operation.

2. Humidifier (HUM)

Quick-connect terminal (HUM) and screw terminal (Com) are
provided for 24-v humidifier connection. The terminals are
energized with 24v (0.5-amp maximum) after inducer motor
prepurge period.

NOTE:

A field-supplied, 115-v controlled relay connected to

EAC terminals may be added if humidifier operation is desired
during blower operation.

Step 9—Venting

Refer to the enclosed Installation Instructions, GAMA Venting
Tables for Category I Furnaces and Venting Tables for Category I
Fan-Assisted Furnaces. The horizontal portion of the venting
system shall maintain a minimum of 1/4-in. upward slope per
linear ft and it shall be rigidly supported every 5 ft or less with
hangers or straps to ensure that there will be no movement after
installation.

Fig. 10—Typical Gas Pipe Arrangement

A89414

GAS

SUPPLY

MANUAL
SHUTOFF
VALVE

SEDIMENT
TRAP

UNION

Table 6—Electrical Data

UNIT SIZE

VOLTS—
HERTZ—

PHASE

OPERATING VOLTAGE RANGE

MAXIMUM

UNIT AMPS

MINIMUM

WIRE GAGE

MAXIMUM WIRE

LENGTH FT‡

MAXIMUM

FUSE OR HACR-

TYPE CKT BKR

AMPS†

Maximum*

Minimum*

050-08

115—60—1

127

104

6.6

14

42

15

050-12

115—60—1

127

104

8.1

14

34

15

070-08

115—60—1

127

104

6.7

14

42

15

070-12

115—60—1

127

104

8.4

14

33

15

096-12

115—60—1

127

104

9.2

14

30

15

096-16

115—60—1

127

104

10.2

14

28

15

115-16

115—60—1

127

104

10.1

14

28

15

115-20

115—60—1

127

104

13.3

12

33

20

135-20

115—60—1

127

104

14.3

12

31

20

* Permissible limits of the voltage range at which the unit will operate satisfactorily.
† Time-delay fuse is recommended.
‡ Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.

8

Summary of Contents for 58RAV Series

Page 1: ...erve precautions in the literature on tags and on labels attached to or shipped with the unit and other safety precautions that may apply Follow all safety codes In the United States follow all safety codes including the National Fuel Gas Code NFGC NFPA No 54 1992 ANSI Z223 1 1992 In Canada refer to the current ama CANADIAN GAS ASSOCIATION APPROVED R Table 1 Clearances From Combustible Materials I...

Page 2: ...charges from personnel and hand tools which are held during the procedure These precautions will help to avoid exposing the control to electrostatic discharge by putting the furnace the control and the person at the same electrostatic potential 1 Disconnect all power to the furnace DO NOT TOUCH THE CONTROL OR ANY WIRE CONNECTED TO THE CON TROL PRIOR TO DISCHARGING YOUR BODY S ELEC TROSTATIC CHARGE...

Page 3: ...e personal injury or death For accessory installation details refer to the applicable installa tion literature NOTE Remove all shipping brackets and materials before oper ating the furnace Step 1 Location GENERAL Do not install furnace in a corrosive or contaminated atmo sphere Make sure all combustion and circulating air require ments are followed in addition to all local codes and ordinances Do ...

Page 4: ...sume that wood louvers have a 20 percent free area and metal louvers or grilles have a 60 percent free area Screens when used must not be smaller than 1 4 in mesh Louvers and grilles must be constructed so they cannot be closed The size of the openings depends upon whether the air comes from inside or outside the structure 1 All air from inside the structure a Each opening MUST have at least 1 sq ...

Page 5: ...12 MAX 1 SQ IN PER 4000 BTUH OUTDOORS 1 SQ IN PER 4000 BTUH 1 SQ IN PER 2000 BTUH 12 MAX Use any of the following combinations of openings A B C D D E F G NOTE Minimum dimensions of 3 In F G For Example 58RAV FURNACE INPUT BTUH FREE AREA PER OPENING SQ IN ROUND PIPE IN DIA 46 000 11 5 4 69 000 17 3 5 92 000 23 0 6 115 000 28 8 7 135 000 34 5 7 For Example 58RAV FURNACE INPUT BTUH FREE AREA PER OPE...

Page 6: ...rom each corner by hanger bolts 4 each 3 8 in all thread rod cut to desired length 1 X 3 8 in flat washer 3 8 in lockwasher and 3 8 in nut Dimples are provided for hole locations See Fig 1 Since horizontal crawlspace installation is very similar to the attic installation refer to Step 4 The installation of a sheet metal shield in front of the louvered control panel is covered in Step 4 For a crawl...

Page 7: ... 1 8 in NPT plugged tapping accessible for test gage connection must be installed immediately upstream of the gas supply connection to the furnace and downstream of the manual shut off valve Place a ground joint union between the gas control manifold and the manual shut off Install a sediment trap in the riser leading to the furnace The trap can be installed by connecting a tee to the riser leadin...

Page 8: ...in control board Any direct shorts during installation service or maintenance could cause this fuse to blow If fuse replacement is required use ONLY a 3 amp fuse of identical size ACCESSORIES 1 Electronic air cleaner EAC Two quick connect terminals marked EAC 1 and EAC 2 are provided for EAC connection See Fig 11 These terminals are energized with 115v 1 5 amp maximum during blower motor operation...

Page 9: ...TE 2 FIELD SUPPLIED FUSED DISCONNECT CONDENSING UNIT TWO WIRE FURNACE R G C W C R G Y GND GND FIELD 24 VOLT WIRING FIELD 115 208 230 460 VOLT WIRING FACTORY 24 VOLT WIRING FACTORY 115 VOLT WIRING 208 230 OR 460 VOLT THREE PHASE 208 230 VOLT SINGLE PHASE WHT BLK WHT BLK NOTES Connect Y terminal as shown for proper operation Some thermostats require a C terminal connection as shown If any of the ori...

Page 10: ...or cooling R G and R Y circuits close The R Y circuit starts the outdoor condensing unit and combined R Y and R G circuits start the furnace blower motor on cooling speed The EAC 1 terminal is energized with 115v whenever the blower is operating on cooling speed When the thermostat is satisfied R G and R Y circuits are broken Furnace blower and EAC continue operating on cooling speed for an additi...

Page 11: ...COMPONENT TEST TWIN TERMINAL TRAN TRANSFORMER 115VAC 24VAC JUNCTION UNMARKED TERMINAL PCB TERMINAL FACTORY WIRING 115VAC FACTORY WIRING 24VAC FIELD WIRING 115VAC FIELD WIRING 24VAC CONDUCTOR ON PCB FIELD WIRING TERMINAL FIELD GROUND EQUIPMENT GROUND FIELD SPLICE PLUG RECEPTACLE L1 NEUTRAL L1 BLWR HI LO TO 115VAC FIELD DISCONNECT NOTE 4 EQUIPMENT GROUND SPARE 1 HEAT SPARE 2 COOL NOTE 8 COM HSIR EAC...

Page 12: ... given natural gas conditions EXAMPLE Heat value 1070 Btu cu ft Specific gravity 0 58 Therefore Orifice No 44 Manifold pressure 3 6 in wc The furnace is shipped with No 43 orifices Therefore in this example all main burner orifices must be changed and the manifold pressure must be adjusted 7 Proceed to item c to adjust manifold pressure b Check gas input rate by clocking gas meter 1 Obtain average...

Page 13: ... 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 3 8 3 3 40 38 39 3 6 3 2 3 4 40 38 39 3 8 3 3 3 5 38 39 3 4 3 6 38 39 3 4 3 7 890 41 42 3 2 3 6 41 42 3 4 3 7 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 3 8 3 3 40 39 3 6 3 4 40 38 39 3 7 3 2 3 5 40 38 39 3 8 3 3 3 6 905 42 3 5 41 42 3 2 3 6 41 42 3 4 3 7 40 41 3 2 3 5 40 41 3 3 3 6 40 41 39 3 4 3 7 3 2 40 41 39 3 5 ...

Page 14: ... 8 Gas Rate Cu Ft Hr SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL 1 cu ft 2 cu ft 5 cu ft 1 cu ft 2 cu ft 5 cu ft 10 11 12 13 14 360 327 300 277 257 720 655 600 555 514 1800 1636 1500 1385 1286 50 51 52 53 54 72 71 69 68 67 144 141 138 136 133 360 355 346 340 333 15 16 17 18 19 240 225 212 200 189 480 450 424 400 379 1200 1125 1059 1000 947 55 56 57 58 59 6...

Page 15: ...econnect inducer motor wires replace control door and turn on 115 v power to furnace 4 Check auxiliary limits when used a Turn off 115 v power to furnace b Remove blower access door c Disconnect red motor lead at blower speed selector Mark terminal for proper re connection d Replace blower access door e Turn on 115 v power to furnace Be sure room thermostat is calling for heat f Allow furnace to o...

Page 16: ...ce Training plus hands on the products in our labs can mean increased confidence that really pays dividends in faster troubleshooting fewer callbacks Course descriptions and schedules are in our catalog CALL FOR FREE CATALOG 1 800 962 9212 Packaged Service Training Classroom Service Training Copyright 1995 CARRIER Corp 7310 W Morris St Indianapolis IN 46231 58ra10si Manufacturer reserves the right...