background image

pressure sufficiently, high-heat pressure switch HPS opens.
The low-heat gas valve solenoid GV remains energized as
long as low-heat pressure switch LPS remains closed.
Blower motor BLWM switches speed for low-gas heat 5
sec after R-W2 circuit opens.

3. Cooling Mode

a. Single-Speed Cooling Outdoor Unit

(See Fig. 11 for thermostat connections.)

(1.) The thermostat closes R to G-and-Y circuits. The

R-Y circuit starts outdoor unit, and R to G-and-Y
circuits start furnace blower motor BLWM on high-
cool speed.

(2.) The EAC terminals EAC-1 and EAC-2 are energized

with 115v when blower motor BLWM is operating.

(3.) When thermostat is satisfied, R to G-and-Y circuits

are opened. The outdoor unit stops, and furnace
blower motor BLWM continues operating on high-
cool speed for an additional 90 sec.

b. Two-Speed Cooling Outdoor Unit

(See Fig. 12 for thermostat connections.)

(1.) The thermostat closes R to G-and-Y1 circuits for low

cooling or closes R to G-and-Y1-and-Y/Y2 circuits
for high cooling. The R-Y1 circuits start outdoor unit
on low-cooling speed, and R-G circuit starts furnace
blower motor BLWM on low-cooling speed (same
speed as for low-gas heat). The R to Y1-and-Y2
circuits start outdoor unit on high-cooling speed, and
R to G-and-Y2 circuits start furnace blower motor
BLWM on high-cooling speed.

NOTE:

Y1 is not located on furnace control, but is found in

outdoor unit. The furnace control CPU controls blower motor
BLWM speed by sensing only G for low-cooling speed and Y/Y2
for high-cooling speed.

(2.) The EAC terminals EAC-1 and EAC-2 are energized

with 115v when blower motor BLWM is operating on
either cooling speed.

(3.) When thermostat is satisfied, R to G-and-Y1 or

R to G-and-Y1-and-Y/Y2 circuits open. The outdoor
unit stops, and furnace blower continues operating on
cooling speed for an additional 90 sec.

4. Continuous Blower Mode

a. When R to G circuit is closed by thermostat, blower motor

BLWM operates on low-gas-heat speed (identical to low-
cool speed). Terminals EAC-1 and EAC-2 are energized
with 115v as long as blower motor BLWM is energized.

b. During "call for heat," blower motor BLWM stops during

ignitor warm-up (17 sec), ignition (7 sec), and blower on
delay (45 sec), allowing furnace heat exchangers to heat up
quickly.

(1.) The blower motor BLWM reverts to continuous

blower speed after heating cycle is completed. In
high-gas heat, furnace control CPU holds blower
motor BLWM at high-gas-heat speed during selected
blower off delay period before reverting to continuous
blower speed.

(2.) When thermostat "calls for low cooling," blower

motor BLWM continues to operate on low-cool speed.
When thermostat is satisfied, blower motor BLWM
continues on continuous blower speed.

(3.) When thermostat "calls for high cooling," blower

motor BLWM operates on high-cool speed. When

thermostat is satisfied, blower motor BLWM operates
an additional 2 sec on high-cool speed before reverting
back to continuous blower speed.

(4.) When R to G circuit is opened, blower motor BLWM

continues operating for an additional 90 sec if no other
function requires blower motor BLWM operation.

5. Heat Pump

NOTE:

An accessory interface kit is required with single-speed

heat pumps. See interface kit Installation Instructions for single-
speed heat pump thermostat and interface connections. No inter-
face kit is needed for 2-speed heat pumps. See 2-speed heat pump
Installation Instructions for thermostat connections.

a. Single-Speed Heat Pump Cooling

(1.) The thermostat and interface kit close R to G-and-

Y/Y2 circuit to start furnace blower motor BLWM on
high-cooling speed. (Y/Y2 input to furnace control is
necessary to provide adequate cooling airflow.)

(2.) The EAC terminals EAC-1 and EAC-2 are energized

with 115v when blower motor BLWM is operating.

(3.) When thermostat is satisfied, furnace blower motor

BLWM continues operating on high-cooling speed for
an additional 90 sec.

b. Two-Speed Heat Pump Cooling

(1.) The thermostat R to G circuits start furnace blower

motor BLWM on low-cooling speed. Thermostat
R to G-and-Y/Y2 circuits start furnace blower motor
BLWM on high-cool speed.

NOTE:

The furnace control CPU controls blower motor BLWM

speed by sensing only G (for low-cooling speed) and Y2 (for
high-cooling speed).

(2.) The EAC terminals EAC-1 and EAC-2 are energized

with 115v when blower motor BLWM is operating on
either cooling speed.

(3.) When thermostat is satisfied, furnace blower motor

BLWM continues operating on cooling speed for an
additional 90 sec.

c. Single-Speed Heat Pump Heating

(1.) The thermostat and accessory interface kit R to G-

and-Y/Y2 circuits start furnace blower motor BLWM
on heat pump high-heat speed (identical to high-cool
speed).

(2.) The EAC terminals EAC-1 and EAC-2 are energized

with 115v when blower motor BLWM is operating.

(3.) When thermostat is satisfied, furnace blower motor

BLWM continues operating on heat pump high-heat
speed for an additional 90 sec.

d. Two-Speed Heat Pump Heating

(1.) The thermostat closes R to G circuit for low heat and

starts furnace blower motor BLWM on heat pump
low-heat speed (identical to low-cooling speed). Clos-
ing R-Y/Y2 circuit to furnace provides blower motor
BLWM heat pump high-heat speed.

NOTE:

The furnace control CPU controls blower motor BLWM

speed by sensing only G (for heat pump low-heat speed) and Y2
(for heat pump high-heat speed).

(2.) The EAC terminals EAC-1 and EAC-2 are energized

with 115v when blower motor BLWM is operating on
either heating speed.

(3.) When thermostat is satisfied, R to G or R to G-and-

Y2 circuits are opened. After opening R to G-and-Y2

14

Summary of Contents for 58DXT

Page 1: ...nd on labels attached to or shipped with the unit and other safety precautions that may apply Follow all safety codes In the United States follow all safety codes including the National Fuel Gas Code NFGC NFPA 54 1996 ANSI Z223 1 1996 and the Installation Standards Warm Air Heating and Air Conditioning Systems NFPA 90B ANSI NFPA 90B In Canada refer to the CAN CGA B149 1 and 2 M95 National Standard...

Page 2: ...uching ungrounded objects 7 An ESD service kit available from commercial sources may also be used to prevent ESD damage INTRODUCTION The model 58DXT Series 110 or Series 120 Furnace is available in sizes 63 000 through 105 000 Btuh input capacities The design of the downflow gas fired furnace is A G A C G A certified for natural and propane gases and for installation on noncombustible flooring The...

Page 3: ...mponent door This label explains how to use the LED status indicated on furnace control which is viewed through the sight glass on door Improper installation adjustment alteration service mainte nance or use can cause carbon monoxide poisoning explo sion fire electrical shock or other conditions which may cause personal injury loss of life or property damage Consult a qualified installer service a...

Page 4: ...r must prevent chilled air from entering furnace If dampers are manually operated they must be equipped with means to prevent operation of either unit unless damper is in full heat or full cooling position HAZARDOUS LOCATIONS Step 2 Air for Combustion and Ventilation Provisions for adequate combustion and ventilation air must be provided in accordance with Section 5 3 Air for Combustion and Ventil...

Page 5: ... air from an unconfined space inside the structure requires 2 openings for structures not usually tight a Each opening MUST have at least 1 sq in of free area per 1000 Btuh of total input for all equipment within the confined space but not less than 100 sq in per opening See Fig 3 and Table 2 The minimum dimension of air openings shall not be less than 3 in b If the building is constructed unusual...

Page 6: ...he first branch take off may require internal acoustical lining As an alternative fibrous ductwork may be used if constructed and installed in accordance with the latest edition of SMACNA construction standard on fibrous glass ducts Both acoustical lining and fibrous ductwork shall comply with NFPA 90B as tested by UL Standard 181 for Class 1 Rigid air ducts SUPPLY AIR CONNECTIONS Connect supply a...

Page 7: ...m of 2 in outside furnace casing Use the proper length of pipes to avoid stress on gas control manifold A failure to follow this warning could result in a gas leak causing fire explosion personal injury or death Use a backup wrench at furnace gas control when connecting gas pipe to furnace to avoid damaging gas controls or manifold Table 3 Opening Dimensions In FURNACE CASING WIDTH APPLICATION PLE...

Page 8: ...or test gage connection Installation of additional 1 8 in NPT plugged tapping accessible for test gage connection installed immediately upstream of gas supply connection to furnace and downstream of manual shutoff valve is not required Place ground joint union between gas control manifold and manual shutoff Fig 6 Furnace Plenum and Subbase Installed on a Combustible Floor A96285 DOWNFLOW SUBBASE S...

Page 9: ...wn in Fig 11 or 12 for proper operation in cooling mode Use AWG No 18 color coded copper thermostat wire only The 24 v circuit contains an automotive type 3 amp fuse located on main control Any 24 v electrical shorts during installation service or maintenance could cause this fuse to blow If fuse replacement is required use ONLY a 3 amp fuse The control will flash code 24 when fuse needs replaceme...

Page 10: ...e thermostat to select gas heating modes The W2 from thermostat must be connected to W2 on furnace control terminal block See Fig 12 Before operating furnace check each manual reset switch for continuity If necessary press and release button to reset switch This furnace is equipped with 2 manual reset limit switches in gas control area The switches will open and shut off power to gas valve if a fl...

Page 11: ...IELD SUPPLIED FUSED DISCONNECT 2 SPEED CONDENSING UNIT FURNACE G R W2 Y2 G Y1 C GND GND FIELD 24 V WIRING FIELD 115 208 230 460 V WIRING FACTORY 24 V WIRING FACTORY 115 V WIRING 208 230 OR 460 V THREE PHASE 208 230 V SINGLE PHASE Y2 Y1 C WHT BLK WHT BLK W1 R W2 COM W W1 Y Y2 NOTES 1 Connect Y terminal as shown for proper operation 2 Some thermostats require a C terminal connection as shown 3 If an...

Page 12: ...witches ALS1 2 used on some horizontal and some downflow models 7 This wire must be connected to furnace sheet metal for control to prove flame 8 Factory connected when LGPS not used RED LS FRS2 RED RED FRS1 WHEN USED ALS1 DSS ORN LGPS YEL NOTE 8 LPS NOTE 8 WHEN USED RED YEL ORN WHEN USED NOTE 6 ALS2 ORN SWITCH 1 2 HEAT SET UP SWITCH NORM HI HT LO HT ON OFF OFF ON BLOWER OFF DELAY SEC SWITCH 3 4 9...

Page 13: ...ower on delay If burner flame is proven 45 sec after gas valve GV is opened blower motor BLWM is energized on appropriate heating speed low gas heat or high gas heat speed Simultaneously EAC terminals EAC 1 and EAC 2 are energized with 115v and remain energized as long as blower motor BLWM is energized f Switching from low to high gas heat If furnace control CPU switches from low gas heat to high ...

Page 14: ...continuous blower speed 3 When thermostat calls for high cooling blower motor BLWM operates on high cool speed When thermostat is satisfied blower motor BLWM operates an additional 2 sec on high cool speed before reverting back to continuous blower speed 4 When R to G circuit is opened blower motor BLWM continues operating for an additional 90 sec if no other function requires blower motor BLWM op...

Page 15: ... or other sources of ignition to check for gas leakage Use a soap and water solution to check for gas leaks A failure to follow this warning could result in fire explosion personal injury or death 3 To operate furnace follow procedures on operating instruction label attached to furnace 4 With furnace operating set thermostat below room tempera ture and observe that furnace goes off Set thermostat ...

Page 16: ... from 2000 to 4500 ft this furnace must be derated 10 percent by an authorized Gas Conver sion Station or Dealer To determine correct input rate for altitude see example above and use 0 82 as derate multi plier factor b Check that gas valve adjustment caps are in place for proper input to be clocked c Obtain yearly heat value average for local gas supply NOTE Be sure heating value of gas used for ...

Page 17: ...42 3 2 1 3 42 3 3 1 4 42 3 4 1 4 42 3 5 1 4 Altitudes 800 43 3 5 1 4 43 3 6 1 5 43 3 7 1 5 42 3 2 1 3 42 3 3 1 3 2001 825 44 3 8 1 6 43 3 4 1 4 43 3 5 1 5 43 3 6 1 5 43 3 7 1 5 to 850 44 3 6 1 5 44 3 7 1 5 44 3 8 1 6 43 3 4 1 4 43 3 5 1 5 3000 875 44 3 4 1 4 44 3 5 1 4 44 3 6 1 5 44 3 7 1 5 44 3 8 1 6 or 900 44 3 2 1 3 44 3 3 1 4 44 3 4 1 4 44 3 5 1 4 44 3 6 1 5 Canada 925 46 3 8 1 6 45 3 8 1 6 44...

Page 18: ... 4 725 44 3 3 1 4 44 3 4 1 4 44 3 5 1 4 44 3 6 1 5 44 3 7 1 5 750 45 3 7 1 5 44 3 2 1 3 44 3 3 1 4 44 3 4 1 4 44 3 5 1 4 775 46 3 6 1 5 46 3 8 1 6 45 3 7 1 5 44 3 2 1 3 44 3 3 1 4 5001 800 46 3 4 1 4 46 3 5 1 5 46 3 7 1 5 46 3 8 1 6 45 3 7 1 5 825 47 3 7 1 5 47 3 8 1 6 46 3 4 1 4 46 3 6 1 5 46 3 7 1 5 to 850 47 3 4 1 4 47 3 6 1 5 47 3 7 1 5 47 3 8 1 6 46 3 5 1 4 875 48 3 7 1 5 48 3 8 1 6 47 3 5 1 ...

Page 19: ...Low Orifice No Manifold Pressure High Low Orifice No Manifold Pressure High Low U S A Only 600 45 3 7 1 5 44 3 2 1 3 44 3 3 1 4 44 3 4 1 4 44 3 5 1 4 625 46 3 6 1 5 46 3 7 1 5 46 3 8 1 6 45 3 8 1 6 44 3 2 1 3 8001 650 47 3 8 1 6 46 3 4 1 4 46 3 5 1 5 46 3 7 1 5 46 3 8 1 6 675 47 3 5 1 4 47 3 6 1 5 47 3 7 1 5 47 3 8 1 6 46 3 5 1 4 to 700 48 3 7 1 5 48 3 8 1 6 47 3 5 1 4 47 3 6 1 5 47 3 7 1 5 725 48...

Page 20: ...ature rise by adjusting blower speed Increase blower speed to reduce temperature rise Decrease blower speed to increase temperature rise For high heat speed selection can be med high med 5 speed blowers only or med low factory setting For low heat speed tap selection can be low factory setting med low or med 5 speed blowers only Table 10 Gas Rate Cu Ft Hr SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL...

Page 21: ...ferred method of checking limit control is to gradually block off return air after furnace has been operating for a period of at least 5 minutes As soon as limit has shut off burners return air opening should be unblocked By using this method to check limit control it can be established that the limit is functioning properly and will operate if there is a motor failure 2 Check draft safeguard swit...

Page 22: ... furnace i Remove blower access door j Reconnect red motor lead reset switch and replace door k Turn on 115 v power to furnace CHECKLIST 1 Put away tools and instruments and clean up debris 2 Check SW 1 through SW 4 after completing installation to ensure desired settings for thermostat type SW 1 and SW 2 and blower off delay SW 3 and SW 4 Refer to Tables 6 and 7 3 Verify manual reset switches hav...

Page 23: ...ocal Codes ________ 1 4 in Upward Slope ________ Joints Secure ________ See Attached Vent Table Instructions CHECKLIST START UP ________ Gas Input Rate Set Within 2 percent of Rating Plate ________ Temperature Rise Adjusted ________ Thermostat Anticipator Setting Ad justed or ________ Thermostat Cycle Rate 3 Cycles per Hr Selected CHECK SAFETY CONTROLS OPERATION ________ Primary Limit ________ Pre...

Page 24: ...ce Training plus hands on the products in our labs can mean increased confidence that really pays dividends in faster troubleshooting fewer callbacks Course descriptions and schedules are in our catalog CALL FOR FREE CATALOG 1 800 962 9212 Packaged Service Training Classroom Service Training Copyright 1999 CARRIER Corp 7310 W Morris St Indianapolis IN 46231 58dxt4si Manufacturer reserves the right...

Reviews: