![background image](http://html1.mh-extra.com/html/carrier/50gs-sizes-018-060/50gs-sizes-018-060_installation-start-up-and-operatig-instructions_2562684016.webp)
COOLING SEQUENCE OF OPERATION
With the room thermostat SYSTEM switch in the COOL position
and the FAN switch in the AUTO position, the cooling sequence
of operation is as follows:
When the room temperature rises to a point that is slightly above
the cooling control setting of the thermostat, the thermostat
completes the circuit between thermostat terminal R to terminals Y
and G. These completed circuits through the thermostat connect
Fig. 13—Wiring Diagram (208/230-60-3)
C99004
16
Summary of Contents for 50gs sizes 018-060
Page 27: ...27 ...