![Carrier 38QPCT18C-708 Installation Manual Download Page 49](http://html1.mh-extra.com/html/carrier/38qpct18c-708/38qpct18c-708_installation-manual_2560775049.webp)
47
TEST RUNNING
(Cont.)
20.3 STEPS FOR HEATING TEST RUNNING
a.
Move circuit breaker to ON position.
b.
Operate the system for heating operation at high fan speed by using wireless remote control.
c.
After system operation becomes stabilized:
-
Measure high pressure to check correct refrigerant charge. (See figure)
-
Measure total Amps consumed by the system.
-
Measure system-working voltage.
Outdoor Unit 38QPCT18H Outdoor Unit 38QPCT24H
System Heating Test Running
Hi Wall Split System – Heat Pump
SYSTEM MODEL
53QPCT18H-708F
53QPCT24H-708F
AMBIENT TEMP ºC
7
7
HIGH PRESSURE PSI
246 287
TOTAL AMPS
8.1
12.0
NOTE
Readings at 220 volt and 20 ºC return air to indoor unit
and high speed of indoor unit motor.
(1) High Pressure Measuring.
(1)
Details
Details
(1)
(1) High Pressure Measuring.
Summary of Contents for 38QPCT18C-708
Page 54: ...www miraco com eg...