![Carrier 38QPCT18C-708 Installation Manual Download Page 31](http://html1.mh-extra.com/html/carrier/38qpct18c-708/38qpct18c-708_installation-manual_2560775031.webp)
29
CONNECTING REFRIGERANT PIPING (Cont.)
16.6 DESCRIPTION OF REFRIGERANT CONNECTIONS OF OUTDOOR UNIT
(1) Gas flare valve. (2) Gas service valve.
(3) Gas port to open & close. (4) Cap for gas service valve.
(5) Cap for gas port. (6) Liquid flare valve.
(7) Liquid port to open & close. (8) Cap for liquid port.
16.7 DESCRIPTION OF REFRIGERANT CONNECTIONS OF INDOOR UNIT
Refrigerant
Connections Details
16-8 DESCRIPTION OF REFRIGERANT CONNECTIONS
OF REFERIGERANT PIPING LINES
(1) Gas piping line
(2) Liquid piping line
16.9 CUTTING AND FLARING TOOLS
Make sure that have the required tools available before preparing refrigerant piping lines
Half Union
Gas
Half Union
Liquid
Pipe Cutter
Flare Tool
Indoor Unit
Refrigerant
Connections
(1)
(2)
4
5
2
3
1
7
6
8
Outdoor Unit
38QPCT18
4
5
2
3
1
7
6
8
Outdoor Unit
38QPCT24
Summary of Contents for 38QPCT18C-708
Page 54: ...www miraco com eg...