background image

Installation Instructions

25HPA

Performance

t

Series Heat Pump

with Puron

r

Refrigerant

Sizes 18 to 60

1--1/2 to 5 Nominal Tons

A05341

Fig. 1

---

25HPA

TABLE OF CONTENTS

PAGE

SAFETY CONSIDERATIONS

2

. . . . . . . . . . . . . . . . . . . . . . .

INSTALLATION RECOMMENDATIONS

2

. . . . . . . . . . . . .

INSTALLATION

3 -- 10, 17

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 1 -- Check Equipment & Jobsite

3

. . . . . . . . . . . . . . .

Step 2 -- Install on Solid Pad

3

. . . . . . . . . . . . . . . . . . . . . .

Step 3 -- Clearance Requirements

3

. . . . . . . . . . . . . . . . . .

Step 4 -- Operating Ambient

3

. . . . . . . . . . . . . . . . . . . . . .

Step 5 -- Elevate Unit

3

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 6 -- Install TXV

3 -- 4

. . . . . . . . . . . . . . . . . . . . . . . . .

Step 7 -- Make Piping Connections

5 -- 7

. . . . . . . . . . . . . .

Step 8 -- Make Electrical Connections

7 -- 8

. . . . . . . . . . . .

Step 9 -- Compressor Crankcase Heater

8

. . . . . . . . . . . . .

Step 10 -- Install Electrical Accessories

8

. . . . . . . . . . . . . .

Step 11 -- Check Defrost Thermistor and OAT Thermistor

Attachments

8

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 12 -- Start--Up

9

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Step 13 -- Check Charge

10, 17

. . . . . . . . . . . . . . . . . . . . . .

GENERAL SEQUENCE OF OPERATION

11

. . . . . . . . . . .

HP SYSTEM FUNCTIONS AND SEQUENCE OF

OPERATION

11 -- 14

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

TROUBLESHOOTING

15 -- 16

. . . . . . . . . . . . . . . . . . . . . . . .

FINAL CHECKS

18

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

CARE AND MAINTENANCE

18

. . . . . . . . . . . . . . . . . . . . . .

PURON

R

REFRIGERANT QUICK REF. GUIDE

18

. . . . .

Summary of Contents for 25HPA Performance Series

Page 1: ...ements 3 Step 4 Operating Ambient 3 Step 5 Elevate Unit 3 Step 6 Install TXV 3 4 Step 7 Make Piping Connections 5 7 Step 8 Make Electrical Connections 7 8 Step 9 Compressor Crankcase Heater 8 Step 10...

Page 2: ...h a suitable warning label INSTALLATION RECOMMENDATIONS NOTE In some cases noise in the living area has been traced to gas pulsations from improper installation of equipment 1 Locate unit away from wi...

Page 3: ...23 3 4 36 1 2 X 40 9 5 8 6 13 16 28 3 4 A05177 Fig 3 Tiedown Knockout Requirements On rooftop applications locate unit at least 6 in above roof surface STEP 4 Operating Ambient The minimum outdoor ope...

Page 4: ...R 22 Indoor Coil 1 Pump system down to 2 psig and recover refrigerant 2 Remove coil access panel and fitting panel from front of cabinet 3 Remove TXV support clamp using a 5 16 in nut driver Save the...

Page 5: ...or coil are exposed to atmosphere they must be evacuated to 500 microns to eliminate contamination and moisture in the system Table 1 Accessory Usage Accessory REQUIRED FOR LOW AMBI ENT APPLICATIONS B...

Page 6: ...ilure to follow this caution may result in equipment damage or improper operation Service valves must be wrapped in a heat sinking material such as a wet cloth while brazing CAUTION UNIT DAMAGE HAZARD...

Page 7: ...tdoor unit has not shifted during shipment Ensure tubes are not rubbing against each other or any sheet metal Pay close attention to feeder tubes making sure wire ties on feeder tubes are secure and t...

Page 8: ...contact with tubing sheet metal etc STEP 9 Compressor Crankcase Heater When equipped with a crankcase heater furnish power to heater a minimum of 24 hr before starting unit To furnish power to heater...

Page 9: ...properly start up system 1 After system is evacuated fully open liquid and vapor service valves 2 Unit is shipped with valve stem s closed and caps installed Replace stem caps after system is opened...

Page 10: ...vice port 3 Measure liquid line temperature by attaching an accurate thermistor type or electronic thermometer to liquid line near outdoor coil 4 Refer to unit rating plate for required subcooling tem...

Page 11: ...ing Operation This product utilizes either a standard indoor thermostat or Infinity communication User Interface With a call for cooling the outdoor fan reversing valve and compressor are energized Wh...

Page 12: ...ater than or equal to 100 deg F S Fifteen second delay at termination of defrost before the auxiliary heat W2 is de energized S Twenty second delay at termination of defrost before the outdoor fan is...

Page 13: ...ches on the unit control board or in the Infinity control if used The Infinity Control selection overrides the control board dip switch settings Auto defrost is available with Infinity communicating c...

Page 14: ...he wiring label diagram This is a 24vac output that is energized whenever the compressor is energized It closes in the compressor off mode to prevent refrigerant migration into the unit through the li...

Page 15: ...cooling continues the control will energize the compressor contactor every 15 minutes If the thermal protector closes at the next 15 minute interval check the unit will resume operation If the therma...

Page 16: ...ir flow Control Fault 45 Outdoor unit control board has failed Control board needs to be replaced Brown Out 24 v 46 The control voltage is less than 15 5v for at least 4 seconds Com pressor and fan op...

Page 17: ...89 84 342 100 95 90 85 349 102 97 92 87 356 103 98 93 88 363 105 100 95 90 370 106 101 96 91 377 107 102 97 92 384 109 104 99 94 391 110 105 100 95 Liquid Pressure at Service Valve Required Subcooling...

Page 18: ...with 550 psig low side retard S Use hoses with 700 psig service pressure rating S Leak detectors should be designed to detect HFC refrigerant S Puron refrigerant as with other HFCs is only compatible...

Reviews: