1-7.LEVELING
・
Turn bolts for level adjustment until the sinker fit the center of the pipe.
・
The pipe for level adjustment appier the bottom of control panel side(LJ-01) or
power box side(LJ-02/03).
・
Insert plates between level adjustment bolts and foundation.
・
Don't implant level adjustment bolts into the foundution.
・
Be sure to install the chiller horizontally. If not there have a bad influence for chiller performance.
Fix the anchor bolts
1) Don't weld washers on the chiller's frame.
2) Tight up the nuts
string
sinker
pipe
Bolt for level
adjustment
Pipe for
level
adjustment
Base of the chiller
Bolt for level
dj t
t
Plate
Anchor bolt