11
6. Installation and commissioning
6. Installation and commissioning
6.2 Installation
6.2 Installation
•
Turn off the water supply prior to starting the installation work.
Mount the device only in drinking water installations according to AS/NZS3500.1 and AS/NZS3500.4, directly
downstream of the water metering device. Do not apply stresses.
Flush the pipes before installation.
An optional water filter may be installed
upstream of the valve if required.
Water flow direction
Point of entry installation
Eco Valve
Please pay attention to the Flow Direction arrow
marked on the housing!
•
Re-open the water supply.
•
Check that the valve connections are water-tight!
•
Open the battery compartment and insert the 9V block battery (supplied).
Be sure to observe the polarity!
CAUTION!
RISK OF EXPLOSION IF BATTERY IS REPLACED BY AN INCORRECT TYPE.
Dispose of used batteries according to the instructions.