
Index
1.1.2.2 UWP 3.0 as a Modbus Master
1.1.2.3 UWP 3.0 as a Modbus Slave
1.1.2.4 How to connect energy meters
1.1.4.2 UWP 3.0 as a Modbus/TCP Master
1.1.4.3 UWP 3.0 as a Modbus/TCP Slave
1.2 Managing additional field-buses: the bus generator concept
1.2.1 Wiring the high speed bus
How to extend the Dupline ® bus
1.3.1.4 Placing the SB2REP230 in a project
1.3.2 Dupline: cable and installation tips
1.3.2.1 New Installation Planning
1.3.2.2 Retrofit Installation using existing cables
1.3.2.4 Cable Splices and Connections
1.3.3 How to define the number of Dupline® networks
1.3.4 Dupline® bus in the cabinet
1.5 How to connect the Mobile modem
1.5.1 How to connect the USB Dongle Connection Module SH2DSP24
1.9 How to size the Carlo Gavazzi DC power supply
1.9.1 How to calculate the needed power
1.9.2 How to wire the power supply
2 INSTALLING THE BUILDING AUTOMATION SYSTEM
3 APPENDIX “A” – RS485 NETWORK GUIDELINES