23
EM530/EM540 - User manual | CARLO GAVAZZI Controls SpA
Maintenance and disposal
Troubleshooting
Note
:
in case of other malfunctions or of any failure, please contact the CARLO GAVAZZI branch or the distributor for your
country
Measuring problems
Problem
Cause
Possible solution
The ‘EEEE’ indication is displayed
instead of a measurement
The analyser is not used within the
prescribed measuring range; as a
consequence, the measurement exceeds the
maximum permitted value or is the result of
a calculation with at least one measurement
in error.
Uninstall the analyser
The analyser has just been switched on and
the interval defined for the calculation of the
average power values (default: 15 min) has
not expired yet.
Wait. If you wish to change the interval, access the
Dmd page of the Settings menu
The displayed values are not the
expected ones
Electrical connections are incorrect
Verify the connections
The current transformer settings are incorrect Check the set current transformer ratio
Alarms
Problem
Cause
Possible solution
An alarm is triggered, but the measurement
has not exceeded the threshold value
The value with which the alarm variable
is calculated is in error
Check the set current transformer parameters
The alarm is not activated and deactivated
as expected
The alarm settings are incorrect
Check the set parameters
Communication problems
Problem
Cause
Possible solution
No communication can be established with
the analyser
Communication settings are incorrect
Check the set parameters
Communication connections are
incorrect
Verify the connections
The settings of the communication
device (third-party PLC or software) are
incorrect
Check the communication with the UCS software
Display problem
Problem
Cause
Possible solution
You cannot display all measurement pages
The page filter is enabled
Disable the filter, see “Page filter” on page 19
Download
EM530 installation manual
www.productselection.net/MANUALS/UK/EM530_im_inst.pdf
EM530 datasheet
http://www.productselection.net/Pdf/UK/EM530.pdf
EM540 installation manual
www.productselection.net/MANUALS/UK/EM540_im_inst.pdf
EM540 datasheet
http://www.productselection.net/Pdf/UK/EM540.pdf
UCS Desktop
www.productselection.net/Download/UK/ucs.zip
UCS Mobile
Google Play Store
Summary of Contents for EM530DINAV23XM1PFA
Page 1: ...EM530 EM540 Energy analyzer for three phase and two phase systems USER MANUAL...
Page 25: ...EM530 EM540 Analizzatore di energia per sistemi trifase e bifase MANUALE D USO...
Page 49: ...EM530 EM540 Energieanalysator f r Dreiphasen und Zweiphasensysteme BETRIEBSANLEITUNG...
Page 73: ...EM530 EM540 Analyseur d nergie pour syst mes bi et triphas s MANUEL D EMPLOI...
Page 97: ...EM530 EM540 Analizador de energ a para sistemas trif sicos y bif sicos MANUAL DE USUARIO...
Page 121: ...EM530 EM540 Energianalysator til to og trefasede systemer BRUGERMANUAL...
Page 145: ...EM530 EM540...
Page 153: ...9 EM530 EM540 CARLO GAVAZZI Controls SpA 3Pn PF 0 7 L PF 0 96 C UCS MENU INFO TERMINAL...
Page 154: ...10 EM530 EM540 EM530 EM540 CARLO GAVAZZI Controls SpA EM530 EM540 SETTINGS INFO RESET...
Page 164: ...20 EM530 EM540 CARLO GAVAZZI Controls SpA RESET RESET QUICK SET UP MID CT CT...