
LB-05053-03-GB
Re-filling the boiler.
This operation will automatically stop when the
During this phase all the keypad leds slowly flash
Heating the boiler.
During the heating up phase the display show
During this phase heating of the boiler starts, wait about 20 minutes to reach the set temperature.
This operation will automatically stop when the boiler temperature is
PLEASE NOTE:
All Version
DURING THIS STAGE, KEEP THE STEAM LEVER
WILL RELEASE THE AIR FROM THE BOILER
Check the delivery pressure in the pump gauge by fitting
coffee
dose in order to deliver at 8/9 bars.
Pag. 8
This operation will automatically stop when the level of the probe is reached.
FILLING UP
During this phase all the keypad leds slowly flash simultaneously.
During the heating up phase the display shows the boiler temperature and all the keypad leds light on in sequence
HEATING BOILER
XXX °C
During this phase heating of the boiler starts, wait about 20 minutes to reach the set temperature.
This operation will automatically stop when the boiler temperature is reached, the display shows :
SELECT DRINK
XXX °C
EEP THE STEAM LEVER OPEN FOR A FEW SECONDS, THIS OPERATION
FROM THE BOILER
the pump gauge by fitting
the filter holder filled with properly ground, pressed
in order to deliver at 8/9 bars.
03-04-13
light on in sequence from right to left.
NDS, THIS OPERATION
the filter holder filled with properly ground, pressed