
4.50
Disassembly and cleaning procedures
Switch the ma-
chine off putting the
switching on button
on the position “O”.
Disconnect the pow-
er cable.
Close the drainage
cap.
Remove the dis-
charge hose situat-
ed underneath the
boiler.
Re-assemble the
rear panel using the
screws.
2
1
CLOSED
OPEN
Description end
Boiler emptying
Switching on button
Power cable
Summary of Contents for BlueDotPlus
Page 1: ...MAINTENANCE MANUAL Translation of original instructions BlueDot Plus...
Page 2: ......
Page 5: ...3 Table of contents MANUAL REVISION DATE MODIFICATIONS First edition...
Page 6: ...4 Table of contents Page intentionally left blank...
Page 18: ...1 12 Introduction Page intentionally left blank...
Page 36: ...2 18 Description of the machine Page intentionally left blank...
Page 248: ...5 122 Programming Page intentionally left blank...
Page 260: ...7 10 Troubleshooting Page intentionally left blank...
Page 261: ......