
CL-MC-XE1-IP-Y Series (1/2/4 E1) User Manual
- 5 -
Chapter 2 Installation Notes
2-1
Description
This chapter provides the information needed to install CL-MC-XE1-IP-Y series. It is important to follow
the installation instructions to ensure normal operation of the system and to prevent damages from
human negligence.
2-2
Unpacking
If there is a possibility for future relocation of the CL-MC-XE1-IP-Y unit, please keep the packing cartons
and protection packaging material.
Please carefully unpack and inspect the unit and accessories for potentially damaged and missing parts.
Contact our nearest sales representative or our company directly if you detect any damaged or missing
parts. Improper handling during shipment may cause early failure.
2-3
Site Requirements
Users should follow the precautions below to insure the safety and to minimize the risk of damage to the
equipment:
Make sure that the power outlet is properly grounded. Please refer to article 250 of the National Electrical
Code (NEC) Handbook. Proper grounding should include a minimum of:
A grounded rod buried outside the building at least 8 feet (2.44 meters) deep.
2-4
Site Selection
For best performance, the distance of 6 feet (1.83 meters) from the AC power outlet to CL-MC-XE1-IP-Y
series is preferred. To allow easy access to the equipment, leave at least 36 inches (90 cm) clearance in
the front and at least 4 inches (10.2 cm) at the rear.
Caution
:
To avoid overheating, leave at least 1 inch (2.5 cm) on either side of the CL-MC-XE1-IP-Y
series. Also, DO NOT stack other equipments on top of the CL-MC-XE1-IP-Y unit in order to
ventilate the system normally.
www.carelink.com