Referring to the table below (or on the circuit board) for terminal connections, connect each 
wire to terminal block P2 or P3.  Refer to Figure No. 12 for terminal block location. 

 

Load Cell Wiring Table 

– P2 or P3 

Board Label 

Function 

Board Label 

Function 

+EXC 

+ EXCITATION 

-SIG 

- SIGNAL 

+SEN 

+ SENSE 

-SEN 

- SENSE 

+SIG 

+ SIGNAL 

-EXC 

- EXCITATION 

SHLD 

SHIELD (Not used, the shield wire is connected to metal gland). 

 

9. 

To terminate a wire, use a small flat blade screwdriver and press down on the release bar 
for the terminal.  Insert the wire into the opening and remove the screwdriver, allowing the 
release bar to return to its original position, locking the wire in place.  See Figure No. 9.

 

 

  

 

10. 

Repeat the procedure until all wires are in place. 

 

11. 

After all terminations have been made, remove the excess cable from the enclosure. 

 3/4 inch 

Figure No. 8 

5 to 6 inches 

 1/4 inch 

Insert 
Wire 

 Press 
 Down 

Figure No. 9 

Summary of Contents for 225-DS

Page 1: ...DS 225 Dual Scale Input Card Installation Manual 8200 M535 O1 Rev B 203 E Daugherty Webb City MO 64870 USA Printed in USA 10 09 Ph 417 673 4631 Fax 417 673 2153 www cardinalscale com Technical Support...

Page 2: ...8200 M535 O1 Rev B 225 DS 2...

Page 3: ...nd Resolve Radio TV Interference Problems prepared by the Federal Communications Commission helpful It is available from the U S Government Printing Office Washington D C 20402 Stock No 001 000 00315...

Page 4: ...h or without totalizing with the use of the 225 DS without the need for complicated programming devices The 225 DS card resides in the 225 main enclosure and has a 16 pin dual in line Internal Bus con...

Page 5: ...e Rate selectable 1 to 100 samples per second Auto Zero Range 0 5 divisions or 1 through 9 divisions Excitation Voltage 12 0VDC Signal Input Range 1 0 mV min to 40 mV max with dead load boost Load Cel...

Page 6: ...are not to stretch the cable and wires between the panel and main housing Lay the back panel on the workbench next to the indicator IMPORTANT You may need to loosen the gland connectors for the scale...

Page 7: ...6 32 threaded stud Reinstall the washer and 6 32 nut and tighten Refer to Figure No 3 NOTE Position the ring terminal with the wire extending away from the main board as shown to prevent shorting 8 T...

Page 8: ...n the holes in the 225 DS with the threaded mounting spacers on the main board and using the four lock washers and screws supplied with the 225 DS secure the card to the main board Refer to Figure No...

Page 9: ...s shown in Figure No 6 3 Loosen and remove the metal gland connector nut and remove the plastic insert 4 Referring to Figure No 7 route the single cable from the load cell or load cell junction box th...

Page 10: ...ITATION SHLD SHIELD Not used the shield wire is connected to metal gland 9 To terminate a wire use a small flat blade screwdriver and press down on the release bar for the terminal Insert the wire int...

Page 11: ...ck over the plastic insert and then insert the plastic insert with the shield wire into the gland connector Figure No 10 13 The shield wire is secured when tightening the gland connector nut See Figur...

Page 12: ...P2 or P3 Refer to Figure No 12 for terminal block location Load Cell Wiring Table P2 or P3 Board Label Function Board Label Function EXC EXCITATION SIG SIGNAL SEN SENSE SEN SENSE SIG SIGNAL EXC EXCITA...

Page 13: ...NS J4 jumpers on the 225 DS must be open on one pin only or removed Dead Load Boost Jumper DLB For very low dead loads less than 10 of the combined load cell capacity connect the dead load boost DLB j...

Page 14: ...splayed press the 1 key and then the ENTER key The display will change to show SETUP MENU 1 SETUP MENU 1 1 USA XXX 6 CLR TARE XXX 2 NSC XXX 7 CLEAR ID XXX 3 LFT XXX 8 NO OF SCALES X 4 OIML XXX 9 TOTAL...

Page 15: ...oft keys and then the ENTER key to save the new setting and return to SETUP MENU 1 10 MODE OF OP X XXXX MODE OF OPERATION IMPORTANT The Mode Of Op is limited to options 0 NORM Normal Indicator 1 IDS I...

Page 16: ...or the setup of each scale IMPORTANT All scales to be included in the totalizer must have identical settings for BASE UNITS CNVT UNITS INTERVAL DDP SAMPLES STABLE and STBL CNT If these are not the sam...

Page 17: ...and then that scale will become the active scale Zero the Scale with TOTALIZE NO Active Scale Press the ZERO key Only the active scale will be zeroed Zero Scale 1 Press the 1 key and then the ZERO key...

Page 18: ...then the ZERO key Only Scale 2 Press the 2 key and then the ZERO key Only Scale 3 Press the 3 key and then the ZERO key IMPORTANT Note that the SCALE TOTALIZER cannot be manually zeroed It will only...

Page 19: ...8200 M535 O1 Rev B 225 DS 16...

Page 20: ...8200 M535 O1 Rev B 225 DS 17...

Reviews: