
Nm
MANUFACTURER
MANUAL
6 Nm
8 Nm
Nm
CORRECT TORQUE VALUES ARE INDICATED
DIRECTLY ON THE RESPECTIVE COMPONENT OR AT
THE COMPONENT MANUFACTURER MANUAL.
PLEASE ALWAYS USE
TORQUE WRENCH.
ALWAYS ENSURE
TO USE THE
CORRECT TORQUE.
MAKE SURE THE SYSTEM IS
SWITCHED OFF BEFORE ANY WORK
ON THE BIKE. ENSURE THE SYSTEM
CANNOT BE SWITCHED ON
ACCIDENTALLY.
ACHTE DARAUF, DASS DAS SYSTEM
VOR JEGLICHEN ARBEITEN AM
FAHRRAD AUSGESCHALTET IST.
STELLE SICHER, DASS DAS SYSTEM
NICHT UNBEABSICHTIGT
EINGESCHALTET WERDEN KANN.
VEILLE À CE QUE LE SYSTÈME SOIT
DÉSACTIVÉ AVANT TOUTE
INTERVENTION SUR LE VÉLO.
PEUT PAS ÊTRE MIS EN MARCHE
PAR INADVERTANCE.
+
CHECK MANUAL
MAX
130 kg
8
WARNING
Summary of Contents for GRIZL:ON R112
Page 9: ...9...
Page 10: ...LET S GET STARTED 10 1 UNPACKING 1 3 1 2 1 1 1 5 1 6 1 4...
Page 11: ...11 1 UNPACKING 1 8 1 7...
Page 12: ...4 mm ZERO GAP 6 Nm 4 mm 6 Nm 12 2 COCKPIT INSTALLATION X 2 X 3 X 1 2 3 2 4 2 1 2 2 2 6 2 5...
Page 13: ...max 0 5 Nm TX 6 4 mm 6 Nm NO GAP GAP TX 6 13 2 COCKPIT INSTALLATION 2 7 2 8 2 9...
Page 14: ...5 mm 4 mm 4 mm 2 Nm 14 3 COCKPIT HEIGHT ADJUSTMENT OPTIONAL 3 2 3 3 3 4 3 1...
Page 15: ...5 mm 8 Nm 15 3 COCKPIT HEIGHT ADJUSTMENT OPTIONAL X 2 3 5...
Page 17: ...max min 17 4 SEATPOST ASSEMBLY 4 5...
Page 19: ...Turn bike upside down 19 6 PREPARATION FRONT WHEEL ASSEMBLY 6 3 6 1 6 4 6 2...
Page 20: ...3 mm M5x8 4 Nm 3 mm M5x8 4 Nm 3 mm M5x8 4 Nm 7 FENDER ASSEMBLY 7 2 7 3 7 1...
Page 22: ...22 9 LIGHT ADJUSTMENT 9 1...
Page 24: ...24 11 CHARGING 13 1 10 1 10 3 10 2 11 2 11 3 11 1...
Page 25: ...YOUR BIKE S NOW ASSEMBLED AND CHARGED 25...
Page 32: ...AFTER EVERY RIDE COMPLETE BIKE DRIVETRAIN 2 1 32 MAINTENANCE...
Page 33: ...DRIVETRAIN COMPONENTS AFTER EVERY 2 WEEKS 1 Nm 33 MAINTENANCE...
Page 35: ...CHAIN WEAR CARBON PARTS CABLES SURFACES 35 MAINTENANCE AFTER EVERY 6 MONTHS 4 3 2 1...
Page 37: ...YOUR BIKE S NOW PROPERLY MAINTAINED 37 MAINTENANCE...
Page 39: ...CANYON SUPPORT CENTRE FOR UNBOXING AND ASSEMBLING SCAN HERE READY TO RIDE 39...