
HOT DISKS
AFTER USAGE
Check lights for proper functionality
Test brake system, be aware of dirtiness
especially residuals of lubrication or grease
Check wear of brake pads
Check tire pressure
Check bike, tire & all components for
damage, wear & material fatigue
Check and/or retighten wheel fastening
system, pedals, bolts & nuts
29
CHECKLIST - BEFORE EVERY RIDE
3
4
5
6
2
1
Summary of Contents for GRIZL:ON R112
Page 9: ...9...
Page 10: ...LET S GET STARTED 10 1 UNPACKING 1 3 1 2 1 1 1 5 1 6 1 4...
Page 11: ...11 1 UNPACKING 1 8 1 7...
Page 12: ...4 mm ZERO GAP 6 Nm 4 mm 6 Nm 12 2 COCKPIT INSTALLATION X 2 X 3 X 1 2 3 2 4 2 1 2 2 2 6 2 5...
Page 13: ...max 0 5 Nm TX 6 4 mm 6 Nm NO GAP GAP TX 6 13 2 COCKPIT INSTALLATION 2 7 2 8 2 9...
Page 14: ...5 mm 4 mm 4 mm 2 Nm 14 3 COCKPIT HEIGHT ADJUSTMENT OPTIONAL 3 2 3 3 3 4 3 1...
Page 15: ...5 mm 8 Nm 15 3 COCKPIT HEIGHT ADJUSTMENT OPTIONAL X 2 3 5...
Page 17: ...max min 17 4 SEATPOST ASSEMBLY 4 5...
Page 19: ...Turn bike upside down 19 6 PREPARATION FRONT WHEEL ASSEMBLY 6 3 6 1 6 4 6 2...
Page 20: ...3 mm M5x8 4 Nm 3 mm M5x8 4 Nm 3 mm M5x8 4 Nm 7 FENDER ASSEMBLY 7 2 7 3 7 1...
Page 22: ...22 9 LIGHT ADJUSTMENT 9 1...
Page 24: ...24 11 CHARGING 13 1 10 1 10 3 10 2 11 2 11 3 11 1...
Page 25: ...YOUR BIKE S NOW ASSEMBLED AND CHARGED 25...
Page 32: ...AFTER EVERY RIDE COMPLETE BIKE DRIVETRAIN 2 1 32 MAINTENANCE...
Page 33: ...DRIVETRAIN COMPONENTS AFTER EVERY 2 WEEKS 1 Nm 33 MAINTENANCE...
Page 35: ...CHAIN WEAR CARBON PARTS CABLES SURFACES 35 MAINTENANCE AFTER EVERY 6 MONTHS 4 3 2 1...
Page 37: ...YOUR BIKE S NOW PROPERLY MAINTAINED 37 MAINTENANCE...
Page 39: ...CANYON SUPPORT CENTRE FOR UNBOXING AND ASSEMBLING SCAN HERE READY TO RIDE 39...