background image

Storage & Safety Guidelines 

To ensure maximum performance, store 

Canusa products in a dry, ventilated area. 

Keep products sealed in original cartons 

and avoid exposure to direct sunlight, rain, 

snow, dust or other adverse environmen-

tal elements. Avoid prolonged storage at 

temperatures above 35°C (95°F) or below 

-20°C (-4°F). Product installation should be 

done in accordance with local health and 

safety regulations.

These installation instructions are intended 

as a guide for standard products. Consult 

your Canusa representative for specifi c 

projects or unique applications.

Canusa warrants that the product conforms 

to its chemical and physical description 

and is appropriate for the use stated on the 

installation guide when used in compliance 

with Canusa’s written instructions. Since 

many installation factors are beyond 

our control, the user shall determine the 

suitability of the products for the intended 

use and assume all risks and liabilities in 

connection therewith. Canusa’s liability is 

stated in the standard terms and conditions 

of sale. Canusa makes no other warranty 

either expressed or implied. All information 

contained in this installation guide is to be 

used as a guide and is subject to change 

without notice. This installation guide 

supersedes all previous installation guides 

on this product. E&OE

Canusa-CPS

A division of Shawcor Ltd.

Head Offi ce 
25 Bethridge Road
Toronto, ON, Canada M9W 1M7
Tel: +1 416 743 7111
Fax: +1 416 743 5927

Canada
Dome Tower St. 2200, 
333-7th Avenue SW
Calgary, AB, Canada T2P 2Z1
Tel: +1 403 218 8207
Fax: +1 403 264 3649

Americas
5875 N. Sam Houston Pkwy W., 
Suite 200
Houston, TX, USA 77086
Tel: +1 281 886 2350
Fax: +1 281 886 2353

Middle East
ADPC - Mussafah Port, 
P.O. Box 2621
Abu Dhabi, UAE
Tel: +971 2 496 3500
Fax: +971 2 496 3501

Europe, Africa & Russia
Dellaertweg 9-E, Gebouw 
“Le Carrefour”
2316 WZ Leiden, 
The Netherlands (NL)
Tel: +31 71 80 802 70
Fax: +31 71 80 802 71

Asia-Pacifi c
101 Thomson Road, 
#11-03 United Square
307591 Singapore
Tel: +65 6749 8918
Fax: +65 6749 8919

Quality Management system 

registered to ISO 9001

Part No. 99060-107 

IG_GTS-80/T_rev014

After shrinking is complete, allow the sleeve to cool for 2 hours prior to lowering and 
backfi lling. To prevent damage to the sleeve, use selected backfi ll material, (no sharp 
stones or large particles) otherwise an extruded polyethylene mesh or other suitable 
shield should be used.

Sleeve Installation Cont’d

Backfi lling Guidelines

Epoxy Usage

13

16

14

17

19

18

20

15

Wrap the sleeve loosely around the pipe, 
ensuring the appropriate overlap. Gently 
heat the backing of the underlap and the 
adhesive side of the closure.

Using the appropriate sized torch, begin 
at the centre of the sleeve and heat 
circumferentially around the pipe. Use 
broad strokes. If utilizing two torches, 
operators should work on opposite sides 
of pipe.

Press the closure fi rmly into place.

Gently heat the closure and pat it down 
with a gloved hand. Repeating this pro-
cedure, move from one side to the other. 
Smooth any wrinkles by gently working 
them outward from the centre of the clo-
sure with a roller.

Continue heating from the centre toward 
one end of the sleeve until recovery is 
complete. In a similar manner, heat and 
shrink the remaining side.

While the sleeve is still hot and soft, use 
a hand roller to gently roll the sleeve sur-
face and push any trapped air up and out 
of the sleeve, as shown above. Continue 
the procedure by also fi rmly rolling the 
closure with long horizontal strokes from 
the weld outwards.

Epoxy required for 300 mm / 12” cutback. 

For other cutbacks, divide by 12 and multiply by new 
cutback in inches.

Example:

200 mm (8”) cutback on 610 mm diameter pipe

base: 88 ml x 8/12 = 60 ml base

cure: 22 ml x 8/12 = 15 ml cure

300 mm / 12” cutback and 
0.15 mm / 0.006” epoxy thickness

Shrinking has been completed when the 
adhesive begins to ooze at the sleeve 
edges all around the circumference. 
Finish shrinking the sleeve with long hor-
izontal strokes over the entire surface to 
ensure a uniform bond.

Visually inspect the installed sleeve for 
the following:

•  Sleeve is in full contact with the steel 

joint.

• Adhesive 

fl ows beyond both sleeve 

edges.

•  No cracks or holes in sleeve backing.

Inspection

Pipe O.D.

450mm (18”)

1 torch/induction or infrared heater

>450mm (18”)

2 torches/1 induction or infrared heater

Pipe Diameter

Quantity Required

mm

in

base (ml)

cure (ml)

115

16

4

170

6.6

24

6

230

8.6

32

8

280

10¾

40

10

315

12¾

44

11

355

14

52

13

400

16

56

14

450

18

64

16

500

20

72

18

610

24

88

22

660

26

96

24

760

30

108

27

915

36

132

33

1060

42

152

38

1220

48

172

43

1420

56

200

50

1520

60

216

54

B

D

F

C

E

 

2

 

1

1

2

3

Reviews: