
Innovative Lighting Products
Followspot Operating Instructions
V 1.0 1/11/22
54
1092 West Atlanta Street, SE • Suite 600 • Marietta, GA 30060 • 888-252-5912 • [email protected] • cantousa.com
16: CHANGING A GEL FRAME
Take a few moments to review the process listed below on how to remove the gel frame from the operator’s arms as well as the best
procedure for installing new gel or diffusion into the provided gel frames with fixture.
The gel frame operator arms (7) are designed to accept the provided gel frames that ship with the unit. The X1 also accepts most gel frames
from other fixture manufacturers.
Removing the Gel Frame:
Step 1:
Turn off the power to the fixture by use of the toggle switch (A) on the operator’s side of the fixture. Remove the power cord (B) from
the back of the unit to ensure no accidental power startups occur while working in the direct path of the beam.
*NEVER WORK INSIDE AN OPERATING UNIT WITHOUT IT BEING COOLED AND UNPLUGGED FROM POWER
SOURCE. NEVER EVER WORK INSIDE A UNIT THAT IS TURNED ON.