4.
Transport and handling
4.1
Scope of delivery of Front Cooler
The scope of delivery of a Front Cooler includes:
Qty. Parts
Front Cooler, ready for connection
1
1
1
1
1
1
1
4
Accessories:
Pipe
fi
tting condensate pump
Condensate hose for condensate pump
Condensate hose emergency over
fl
ow
Sealing strip
Connection plug
Cable tie and spreading anchor
Jumper for connection plug (strain relief for connection cable)
Eyebolts
1
Assembly instructions
4.2 Transport
The Front Cooler is delivered shrink-wrapped on a
pallet.
Caution!
Because of its height and small base, the Front Cooler
is subject to tipping. Risk of toppling, especially
after the unit is removed from the pallet!
Caution!
Transport of the Front Cooler without a pallet:
- Use only suitable and technically sound lifting
gear and load-bearing devices with suf
fi
cient
load capacity.
Recommended module handling equipment
Forklift
Pallet Jack
Module Handling
If
possible,
transport
the
module
using
a
forklift
or
pallet jack.
• If using a forklift or pallet jack, ensure that the fork
tine
length
is
suitable
to
safely
move
the
packaged
module.
•
Canovate
recommends
keeping
the
module
in
the
protective
packaging
until
it
has
been
moved
to
the
installation site.
• When handling and unpacking the module, exercise
8
l
Can BREE
ZE
Operating and Maintenance Cooling Unit Instructions 8-14 kW
www.canovate.com
l
l
P. +90 216 484 2222