36
l
Can BREE
ZE
Operating and Maintenance Cooling Unit Instructions 8-14 kW
www.canovate.com
l
l
P. +90 216 484 2222
For Suspending
Heavies
For piping along
the wall
For instant
installation work
18.3
PIPING CONNECTION FOR
OUTDOOR UNIT
1
The pipes can be connected from 4 directions.
Make holes in the piping cover or cabinet for taking
out pipes. Take the pip- ing cover away from the unit,
and make holes by cutting along the guideline at the
rear of the cover or punching with a driver. Remove
the burr with a cutter, and place a insulation (
fi
eld
supplied) to protect cables and pipes
(picture as example)
No
Description
1
Rear side piping work
2
Pipe Cover
3
Right side piping work
4
Bottom side piping work (Knock out hole)
5
Front side piping work
6
Piping work
7
Stop Valve
8
Removing Direction for Service Cover
C A U T I O N
Notes to open/close the service cover:
•
Remove the screws following the instructions
to the above
fi
gure.
•
Slowly press down the cover.
NOTE
Hold the cover with a hand to remove screws as the
cover may fall down.